Date:
Participants
@Emmanuel Sarris
@Gajalakshmi S
@Jomy Jose
@Marek Kukulski
@Pramod Venugopal
@Praveen V
@Vishnu
Agenda
- Integration Test status review
- Availability of NSSMF simulator
- Frankfurt improvement items (Chuanyu & Swami to present)
- AOB
Open Action points from previous meeting
S.No. | Action | Responsible | Status |
---|---|---|---|
20200316_7 | Frankfurt enhancement to be identified this week. | Chuanyu, Swami | Closed |
20200323_1 | Documentation to be completed and checked at the end of Integration Test (so this action will be kept open until then): 1. Setup and demo (readthedocs as well as wiki) 2. Design documentation 3. Component/project level document (OOF, SO, UUI) (readthedocs as well as wiki) 4. Flows - e2e flows, and detailed component interactions, including key parameters 5. E2e use case (readthedocs) | Swami, Lin, Chuanyu | Ongoing |
20200323_2 | Consider CSITs/test automation for our use case (once the Integration Test work is nearly complete) (reach out to Integration Team as needed) | Chuanyu, Swami | Open |
20200323_4 | Discuss further reg. the FM/PM data that will be exposed to NSMF (realized in ONAP) (or first level NSSMF), especially when interacting with external NSSMF(s) - this should also be considered in the APIs/interface discussions | Swami, Henry, Shankar | Open |
20200323_5 | Prepare the e2e scope and demo proposed for Guilin, and align the different tracks to this overall scope | Lin, Swami, Chuanyu, Shankar | Ongoing |
20200330_1 | Update RC0 scorecard | Lin, Swami | Closed |
20200330_2 | Add more details of the Requirements ppt as well as include demo scenarios | Swami, Lin | Ongoing |
20200330_3 | Explore options to use real/simulated NFs (including open source options) | Lin, Swami | Ongoing |
20200330_4 | Clearly highlight the high priority items for Guilin release | Lin, Swami | Closed |
20200330_5 | Call out the Frankfurt improvements items also in the requirements ppt explicitly, e.g., the use of models, resource discovery mechanisms | Swami, Chuanyu | Ongoing |
20200330_6 | Prepare the e2e flows | Swami, Chuanyu | Ongoing |
Notes and Actions
- The Integration Test status, and the progress w.r.to OOF, UUI, EXT-API and SO were reviewed. Specific actions were identified which will be taken up by the respective owners. Another new ONAP setup based on the latest OOM updates will be done by Min this week.
- Swami and Chuanyu presented an overview of the Frankfurt improvements.
S.No. | Action | Responsible |
---|---|---|
20200407_1 | Check latest 3GPP specs reg. roaming and scaling w.r.to Network Slicing | Swami, Chuanyu, Seshu |
20200307_2 | Call for an internal discussion on Modeling aspects for Guilin release | Swami |