Date:  


Participants

Swaminathan Seetharaman

LIN MENG

Shankaranarayanan Puzhavakath Narayanan

Borislav Glozman

Chuanyu Chen

yaoguang wang

dhebeha mj

Enbo Wang

Harry Huang

Fei Zhang

Priyadharshini B

xu ran

Zhang Min

Agenda

  1. Review of Frankfurt test status
  2. Overview of e2e requirements for Guilin

Open Action Points from previous meeting

S.No.

Action

Responsible

Status
20200316_7Frankfurt enhancement to be identified this week.Chuanyu, SwamiOngoing
20200323_1

Documentation to be completed and checked at the end of Integration Test (so this action will be kept open until then):

1. Setup and demo (readthedocs as well as wiki)

2. Design documentation

3. Component/project level document (OOF, SO, UUI) (readthedocs as well as wiki)

4. Flows - e2e flows, and detailed component interactions, including key parameters

5. E2e use case (readthedocs)

Swami, Lin, ChuanyuOngoing
20200323_2Consider CSITs/test automation for our use case (once the Integration Test work is nearly complete) (reach out to Integration Team as needed)Chuanyu, SwamiOpen
20200323_3Update the zoom bridge details for the Guilin release requirements meetings for our use caseLin, SwamiClosed
20200323_4Discuss further reg. the FM/PM data that will be exposed to NSMF (realized in ONAP) (or first level NSSMF), especially when interacting with external NSSMF(s) - this should also be considered in the APIs/interface discussionsSwami, Henry, ShankarOpen
20200323_5Prepare the e2e scope and demo proposed for Guilin, and align the different tracks to this overall scopeLin, Swami, Chuanyu, ShankarOngoing

Notes and Actions

  1. The Integration Test status, and the progress w.r.to OOF, UUI, EXT-API and SO were reviewed.
  2. Lin provided an overview of the Guilin requirements from an e2e perspective, and how various tracks will align. Further details are to be elaborated along with the overall scope, flows and demo proposal.

S.No.

Action

Responsible

20200330_1

Update RC0 scorecard

Lin, Swami
20200330_2Add more details of the Requirements ppt as well as include demo scenariosSwami, Lin
20200330_3Explore options to use real/simulated NFs (including open source options)Lin, Swami
20200330_4Clearly highlight the high priority items for Guilin releaseLin, Swami
20200330_5Call out the Frankfurt improvements items also in the requirements ppt explicitly, e.g., the use of models, resource discovery mechanismsSwami, Chuanyu
20200330_6Prepare the e2e flowsSwami, Chuanyu

Recording

E2E_Network_Slicing_2020_03_30.mp4

  • No labels