Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

 Today's

  • We can use 15mins for general updates
    • from Arundathi on Jackson libs.
      • security issue: analysis; replacing Jackson lib with gson package,  music uses Jackson

        com.orbitz.consul:consul-client:jar (is being used in Portal)

        uses Jackson
      • Sunder says contact Shireesha Kota; 
      • how to tell gson does not have security issues before all the work is done; check nexus server
      • gson is currently being used in Portal, check nexus report, if no issues, use it - action item for Manoop or Sunder
      • Newer version of Jackson still has some security issues
      • do it in phases starting in Dublin 
      • make user story - Lorraine
      • open defect for music - Lorraine
    • from Saravanan on Angular 5 documentation.
  • Remaining time should be used to list actions items to close the open defects at pairwise testing - https://wiki.onap.org/display/DW/Portal+Pair+Wise+Testing+for+Casanblanca+Release .

      ...

      The below is the status for Portal Testing daily update: Oct-10-2018

      • Defects – Highest and High open defect count - 2 issues

      - Sunder updated the code and merge happened today morning, not deployed in windriver servers.

      • Pairwise Tests – Failed 

      - Once the above two defects are fixed, Policy and VID will be displayed on Portal. Assigned the VID defect to VID team.
      - A&AI changes are done by  Arul (A&AI Team) and code merged today morning, not deployed in windriver servers. (Waiting on deployment to windriver OOM)
      - X-Demo App is having issue and the URL's  need to corrected for assigning application to user, getting 500 error. Port number needs to be changed.  

      - Updated the code with the port change from 8989 to 30215 but still portal health Check is getting failed. working with team for getting the correct Health check endpoint.
        

      -         lab-windriver-oom-daily         : Failed TC: 1  Total TC: 16
              lab-windriver-oom-staging-daily : Failed TC: 5  Total TC: 16 
              TC's failing because of timed out issue.  no code changes made. 

          • PORTAL-434 Failed to retrieve AAIUI role/user via Portal Arul.     Fix : Change password in deployment script Apllication on Boarding OOM script - action item - Sunder gave Lorraine new password for A&AI
          • PORTAL-435 Portal URL port number change due to OOM deployment Fix:  Sunder will recommit code
          • PORTAL-436 change port from 8989 to 30215 for OOM deployment Fix:  Sunder will recommit code
          • PORTAL-429 Failed to access Policy GUI from Portal  - Fix:  Sunder will recommit code
          •  VID-324 VID GUI does not come up at Portal's first attempt to bring up VID GUI - double click it comes up  -  might be redirect URL  temp fix
          • MSB-293 MSB fixed it; we are retesting 

      Attendees:  

       Sireesh C. Lorraine W.,Arundathi, 

      ...

      1. SDK repo - Naveen is working on new SDK code coverage changes. New SDK commits made - Please add more reviewers - "Amrita Kundu" <amrkundu@in.ibm.com> is working part time on the code coverage. - no change
      2. Prasad/Swapnali - not active on the code commits. - no change
      3. Please use Epic - PORTAL-268 - for code coverage - PORTAL-273; for sonar issues - PORTAL-247; (focused on Portal repo). - no change

      ...

      1. Source code to be committed for Angular upgrade in a separate folder under SDK (waiting on fixing the build process which is taking long) - gerrit review is done - waiting to merge.
        1. update the xml file - Saravanan.- still reviewing, pending - need to recheck-in
        2. migrated one screen - "usage list" screen - wait for check-in
      2. Bump up the pom and docker versions to snapshots and deploy to T-Lab and Windriver (change in OOM as needed - related to Portal-366) - Saravanan/Sunder/Manoop.
      3. fonts and icons abstraction so that they can be switched with a flag configuration - Saravanan (decided to achieve this configuration during the build rather than at runtime) - ready for commit
      4. One screen implementation needs review with Sunder. - complete , will meet before checking the code

      ...

      1. Look for the vm host names in the files - to clean up - Lorraine already made commit for this changes - Hima can help if requires java file changes.
      2. ECOMP to ONAP word changes in license text - done in Code Cloud - waiting to move to Gerrit - 08/01
      3. Need to review the MUSIC related classes to cleanup the ECOMP keywords - Hima looking into it. (changes are being committed in internal codecloud, soon will be pushed to gerrit).
      4. Hima working through changes - still working on it , Lorraine will help (SDK changes are half way done - reviewing with Sunder).
      5. Finished release notes

      ...

      1. Submit the changes into test-suites and add reviewers - Brian Freeman and Gary Wu - ETA 08/13 - done
      2. Reviews being done and Sireesh fixing the files. - done
      3. Once merged, please request Gary to trigger portal scripts from External labs OOM jenkins jobs - Sireesh. - working with Gary (Image RemovedPORTAL-388 - Adding Portal tests to test-suites repository CLOSED )
      4. Runs from local, needs to be tested in Jenkins (Ritesh working on setting up in local and start creating new test cases).

      ...

      1. New test cases on existing functionalities - inProgress - Sireesh (add this in the wiki)
      2. Update the existing test case to support Angular 5 upgrade on "usage list" screen - Sireesh (add this in the wiki)
      3. Regarding reporting feature - followup with Sunder R 
      4. Regarding language feature - following up with Tao Shen. - had a call, Tao sent document  (5 APIs), GUI page needs updating Leimeng will sent email, another meeting Friday - Tao updated in email about postponing on completing Language feature

      ...

      1. Two resources expected from ECOMP's team (Sireesha and Hima/Hema).
      2. Sitharaman Trichy Ramasubramanian to provide list of resources for this task.
      3. Sunder Tattavarada and Manoop Talasila to prepare the plan and tasks for this feature and provide ETAs.
      4. Jonathan Gathman from AAF to provide support and guidance on all the AAF details. Had call with Jonathan, Sunder working on it, Saravanan - certificate work will be done after Sunder gives them info  ??
      5. met with Jonathan 70% done; 
      6. two steps 2.4 has rest implementation done; 2.5 will have CADI; email sent and partners.
      7. Jonathan having a few roadblocks, has to make some changes (no cookie based solution).

      ...

      1. Micheal O Brien reviewing the logging changes that can be done in portal/sdk - followup -  Image RemovedPORTAL-170 - Logging Improvement OPEN .
      2. Review the current MDCs in the "EPEELFLoggerAdvice.java" class and others that might have.
      3. Lorraine will follow up with Michael tomorrow .
      4. Review needs to be done with Sunder, Shireesha. Kotta by Sep 1st week with Michael's changes.
      5. Some of the logging code is being refactored.

      Attendees:  

      Manoop T, Leimeng S., Sireesh C. Lorraine W., Ezhilarasi, Kishore, Sunder T.

      Release Discussion Items:

      ...