Overview

Project NameEnter the name of the project
Target Release NameCasablanca
Project Lifecycle StateIncubation
Participating Company AT&T

Scope

What is this release trying to address?

Upgrading the Kafka to 0.11

Updating the Message Router with the Kafka upgrade changes

Native Kafka API support

Message Router and AAF integration

Kafka and AAF integration

Buscontroller and AAF integration

Provisioning of authenticated topics

Use Cases

The existing Beijing use cases are still going to be supported .

Minimum Viable Product

Custom Kafka image with AAF integration

Secured Message Router using AAF

Buscontroller using AAF

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

Stories


Longer term roadmap

DMaaP is a premier platform for high performing and cost effective data movement services that transports and processes data from any source to any target with the format, quality, security, and concurrency required to serve the business and customer needs.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable NameDeliverable Description
Docker imageCustom Kafka image and DMaaP images
Source CodeSource code of DMaaP
Release NoteRelease note of the release

Sub-Components

kafka AAF plugin

Architecture


DMaaP Message Router Architecture:

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance11DMaaP Message Router Performance Test Results
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability1172 Hour Stability Testing
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency22Recovery in case of a failure was supported by the Kubernetes and manual recovery was verified.Refer the screenshot for details. DMAAP_Message_Router_Resiliency_Test.jpg
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security11


  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11Met the single site horizantal scaling
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability11DMaaP uses EELF logging framework through the application
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability11

DMaaP documentation is availablle at

http://onap.readthedocs.io/en/latest/submodules/dmaap/messagerouter/messageservice.git/docs/index.html

  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
AAFAuthentication and Authorization FrameworkTBDTBDTBD

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
DMaaP MR APIAPI used to create Topics ,publish a message,subscribe to a Topic etc.Date for which the API is reviewed and agreedTBDAPI documentation
DMaaP Buscontroller APIProvisioning API for management of Topics and FeedsDate for which the API is reviewed and agreedM2API documentation (ReadTheDocs)

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

NameDescriptionVersion
AJSCJava services container3.0.6-oss
KafkaDistributed messaging platform0.11.0
Zoo KeeperCentralized service for maintaining configuration information3.4.6
SpringSpring Framework1.4
DockerContainer engine1.12

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  1. Unit test: Unit tests has at least 50% code coverage.
  2. Functional test: Leverage the robot framework infrastructure to provide the functional test.
  3. Integration test: Support integration team to provide the end to end integration test.
  4. All the above should be automation tests run on the LF Jenkins Infrastructure.


This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out

Provide a link toward the list of all known project bugs.

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out

Fill out the Resources Committed to the Release centralized page.

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended to provide these agreements and dates in this section.

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out

The Documentation project will provide the Documentation Tool Chain to edit, configure, store and publish all Documentation asset.


Other Information

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

Each project must edit its project table available at Project FOSS.


Charter Compliance

The project team comply with the ONAP Charter.