Integration Test Working session (weekday): UTC 17:00 / Eastern 13:00 / Pacific 10:00 daily @ https://zoom.us/j/4466668888 before RC2


Use CaseLabResponsibleStatusVideo URLUse Case Details Testing StatusQuick Notes
1vFW / vDNS

Intel / Windriver



vFW / vDNS

Passed on boarding and instantiation. vFW Closed Loop passed on staging. vFWCL has been fully automated and now runs as part of daily deployment tests.


SDNC Preload - PASS

VID Preload - PASS    - See VID Preload Upload Option Steps

2

vCPE Integration Test Case

Intel / Windriver



vCPE Integration Test Status

Onboarded 5 HEAT templates for infra, vbrg, vbng, vgmux and vgw, and created 5 VNFs.

Finished services creation and distribution

Infra, vBRG, vBNG, vGMUX have instantiated with manually insert the entries in SO table

vCPE vGW Instantiated

Static Route from SDNC to vBNG is done

Network Path Confirmation: confirmed

Closed Loop Test: WIP 


3

vCPE with TOSCA VNF Test Case

CMCC

Yan Yang

Yang Xu (liaison)



Finish the testing on release.


vCPE with TOSCA VNF Integration Test Status (With HPA)

Redeployed ONAP due to resource limitation, restarting design time testing: DONE

UUI trigger SO and SO bpmn workflow execute error, SO team are checking this error.


when updating the SO images in vCPE env.  And the error is the same, Seshu said it's related with


Because SO can't work now , currently we use UUI to trigger the whole CPE NS lifecycle management.


4

5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

TLab



5G - Real Time PM and High Volume Stream Data Collection - Integration Test Status

It has been passed the test at Nokia lab. All pairwise testing has done at Windriver lab. End to end testing has done with staging. Will re-test with release when it is ready.

5

5G - PNF PnP - Integration Test Status

TLab



5G - PNF PnP - Integration Test Status

We were able to run whole flow, but we found out new issue. SO communicate with PRH using wrong topic.

Bug  is raised. Fix planned to be delivered 11/9 EOD

Bug is raised. Fix planned to be delivered 11/15 EOD

Tested on ONAP 5g project in TLab

There is an issue with Execution which would be resolved in Casablanca maintenance patch

Workaround described in bug


6

5G - Bulk PM - Test Status

TLab



It has passed the tests at Ericsson lab.

Tested on SB-04

7

5G - OOF and PCI - Integration Test Cases

Rutgers Winlab ONAP Wireless Lab (OWL)

Proof of Concept only for Casablanca





5G - OOF and PCI - Integration Test Cases

OOF-SDNR pairwise test completed. All other test cases are for POC only. Please see POC Test aspects. New software modules being installed in Rutgers OWL lab. Upgraded ONAP from Beijing to Casablanca. Doing PoC with Casablanca code from Policy, OOF.

Latest: Paring wise testing with OOF is completed. Other is waiting for the full installation with OOM in testing lab with Casablanca.

8

Scale Out - Integration Test Cases and Status

Intel / Windriver


Scale Out - Integration Test Cases and Status

All the test cases have been successfully tested in Integration-SB-04 using the latest released docker images.


Detailed status may be found on the Scale Out Tracking Page


9CCVPN Integration Test CasesCMCC

Yan Yang

Yang Xu (liaison)

For blocking issues, using manual steps have finished the testing. All manual steps can be found here Manual steps for CCVPN Integration Testing


CCVPN -Test Status

Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.

Redeployed ONAP due to resource limitation, restarting design time testing: DONE

has solved.

holmes now can start up , use the manual method which recorded in and Vijay's steps.

Block isssue is There is still issue with the SDC distribution that is being checked, will re-open/close the defect based on the confirmed test today EOD

has been delivered and have been replaced in test env, need UUI team to be verified


UUI can’t parse the service template using SDC tosca parser, so the service creation haven’t triggered by UUI.

N PROGRESS In Pogress, This issue is being checked by Michael.


10

vFW/vDNS HPA Testing

(Test Plan 1 in

HPA & Cloud Agnostic Intent - R3 Test Plan)
Intel / Windriver




vFW/vDNS with HPA Integration Test - Test Status

The testing has been started at Intel, and start testing at SB-06 with HPA.

  • Registered 3 cloud regions with ONAP
  • Created 3 HPA flavors in each of the cloud
  • Triggered multicloud plugin registration and confirmed that the HPA capabilities of the flavors were discovered. The HPA capabilities of the flavors showed up when AAI was queried.
  • Put in policy for the first test case, created service instance and confirmed that oof sent the right cloud region for homing and the right flavor directives for each vm.
  • Onboarded new vFWHPA heat templates
  • Created a service instance that uses OOF and homing and confirmed that the right homing solution and OOF directives were present in the log.
  • Tested SO with OpenStack directly: DONE
  • SO with VIM has issue with header authorization options ()

NEXT STEPS

  • 11/27 afternoon (about 2:30PM EST): Continuing HPA testing with direct Openstack route
  • 11/28 (8AM PST / 11AM EST): Checking back what vim path
  • Create VNF to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)
  • Create VF module to use cloud homing info and flavor directives (and vnic type in case of SRIOV NIC)




  • 11/29
  • basically same issue as SO-1254 has been completed and tested.
11Change Management - Flexible Designer & Orchestrator Intel / Windriver




Testing completed on SB-04 - Summary: Workflow design, testing/certification, distribution, deployment and verification is completed. There is an issue with Execution which would be resolved in Casablanca maintenance patch 

1) SO uploading a list of activities/building blocks to SDC - successfully tested

2) Design workflow in SDC and distribute to SO is completed successfully! Thanks to Michael & Priyanshu for resolving issues.

3) Deploy workflow in SO and orchestrate the execution of the workflow - successfully tested the deployment. Hit an issue on orchestration () - will be resolving soon - will be deploying in Casablanca mostly as a patch. 

12Change Management - Traffic Management-Intel / Windriver

Lukasz Rajewski

Tomasz Osinski




Testing completed by Orange (Lukasz and Tomek) in SB-07 using vFW

Testing completed by Orange (Lukasz and Tomek) on OOM and release dockers in SB-04.

13

Change Management - 5G PNF in-place software upgrade

Intel / Windriver




Testing completed by Huawei (Yaoguang) in Huawei lab using EM and PNF emulator. Retested in Windriver lab OOM env SB-03 (Yang Xu).
14Change Management - Schedule optimizationIntel / Windriver


Functional testing completed. E2E testing in Dublin.



Functional testing completed by Jerry in OOM Staging Daily Windriver.