Based on timeplan of modeling subcommittee, high level requirements need to be finished by M0, below are details of proposal of high level requirements, owner needs to coordinate the modeling spec commitment and code commitment as project manager, and impacted project for their changes.
Modeling Domain | Modeling Requirement | Modeling Requirement Description | Impacted Projects | Use Case Relevance | Modeling Spec Commitment | Code Commitment | Provider Priority | Owner |
---|---|---|---|---|---|---|---|---|
Service | Service Catalog | A Service Catalog is a group of ServiceDescriptors that an organization provides to the consumers via ONAP. | Ext API(y) SDC(n) SO (SDC) AAI (SDC) | VoLTE CCVPN | CMCC Huawei ZTE Vodafone AT&T Verizon Orange | CMCC Huawei ZTE Orange | CMCC: High Vodafone: High AT&T: High Verizon-High | Kevin Scaggs (AT&T) |
Service Descriptor | Design time model: service descriptor model correlating with the service instance in run time | A&AI Ext API SO(y) SDC(->) | (All) VoLTE CCVPN 5G vCPE | CMCC Huawei ZTE Vodafone AT&T Verizon Orange | CMCC Huawei ZTE Orange | CMCC: High Vodafone: High AT&T: High Verizon-High | (CMCC) | |
Resource | ResourceComposite | The ResourceComposite includes several sub-requirements:
| SDC(->) VNFSDK(y) | VoLTE CCVPN | CMCC Huawei ZTE Vodafone AT&T Verizon Intel | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: High Verizon-High | |
VNFD & Alloted resource | ONAP Resource Data Model for Design and Runtime | SDC(->) A&AI OOF SO MultiVIM | All | AT&T Intel | AT&T Intel | AT&T: High | ||
PNF | Design time model of a PNF | SDC(→) SO | VoLTE CCVPN 5G | CMCC Huawei ZTE Vodafone | CMCC Huawei ZTE | CMCC: Medium Vodafone: Medium | ||
PNF instance (run time) | Run time model of a PNF Instance. | SDNC A&AI SO | VoLTE CCVPN 5G | CMCC Huawei ZTE Vodafone | CMCC Huawei ZTE | CMCC: Medium Vodafone: Medium | ||
Scaling | Scaling Use Case Extension (VNF Design and Run time model extension to support scaling use case). Ensure that the onboarding VNF model will properly updated. | SDC(->) A&AI SO Policy clamp | CMCC Huawei ZTE AT&T | CMCC: Medium Vodafone: Medium AT&T: High | ||||
WAN Connection | Wan Connection Information Model CCVPN Use Case IM Proposal SOTN Part | SDC(->) SO A&AI SDNC | VoLTE CCVPN | CMCC Huawei ZTE AT&T Verizon | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: Medium Verizon-Medium | ||
Network Service | Network service is already modeled in R2 but is now moved as a Resource Composite.
| SDC(->) | VoLTE CCVPN 5G | CMCC Huawei ZTE AT&T | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: Medium | ||
SD-WAN | CCVPN Use Case IM Proposal SD-WAN Part SD-WAN along with Cloud Servoces Architecture needs to be considered as a use case | ?? | CCVPN | CMCC Huawei AT&T Verizon | CMCC Huawei | CMCC: High Vodafone: High AT&T: Medium Verizon-High | ||
ElementGroup enhancement | Tied to modeling of Scaling, Homing, Placement, etc. | ?? | AT&T | AT&T: Medium | Andy Mayer (AT&T) Kevin Scaggs (AT&T) | |||
Infrastructure | Multi-cloud | The cloud abstractions needed for homing in the edge cloud across public cloud and service-provider-owned-cloud | ?? | AT&T | ??? | AT&T: Medium |
Documentation after implemented, or implemented but not in the release
Modeling Domain | Modeling Requirement | Modeling Requirement Description | Impacted Projects | Use Case Relevance | Modeling Spec Commitment | Code Commitment | Provider Priority | Owner |
---|---|---|---|---|---|---|---|---|
Service | Service Order | It includes the definition of the managed objects that allows a BSS system to create/delete/update/get an order of a service to a ONAP instance. The Service Order Modeling provided by Ext API R2 team must be reviewed to become part of the ONAP common service IM | Ext API(y) | VoLTE CCVPN Change Mgt | CMCC Huawei ZTE Vodafone AT&T Verizon Orange | CMCC Huawei ZTE Vodafone Orange | CMCC: High Vodafone: High AT&T: High Verizon-High | Andy Mayer (AT&T) |
Resource | License | Presently modeled and used in SDC (ONAP license model) | SDC | ??? | AT&T Verizon | ??? | AT&T: Medium Verizon-Medium | Kevin Scaggs(AT&T) |
Infrastructure | ||||||||
Telemetry | Events & VES | VES Event Descriptor Model according to VES spec v6.0 | DCAE | AT&T Verizon | AT&T: High Verizon-High |
Lower Priority:
Modeling Domain | Modeling Requirement | Modeling Requirement Description | Impacted Projects | Use Case Relevance | Modeling Spec Commitment | Code Commitment | Provider Priority | Owner |
---|---|---|---|---|---|---|---|---|
Service | servicecomposite | Design/run time model : Service IM review according to the agreed Service Composite pattern. (Composite Pattern UML diagram) | SDC (L) Ext API (=SDC) SO | VoLTE CCVPN | CMCC Huawei ZTE Vodafone AT&T Verizon | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: High Verizon-High | |
Service Scaling | A run time service instance could be updated by scaling in/out its capacity via deleting/adding new resources instances, e.g. sites in CCVPN usecase. | SDC SO AAI | VoLTE CCVPN | CMCC Huawei ZTE Vodafone AT&T Verizon | CMCC: High Vodafone: High AT&T: Medium Verizon-Medium | |||
Service Instance | Run time model: service instance model in relation to the design time model and Service Composite pattern. (Composite Pattern UML diagram) | A&AI Ext API SO SDC | (All) VoLTE CCVPN 5G vCPE | CMCC Huawei ZTE Vodafone AT&T Verizon Orange | CMCC: High Vodafone: High AT&T: High Verizon-High | Kevin Scaggs(AT&T) | ||
Resource | ResourceComposite | Design time model: Resource composite model introduction according to the agreed Service Composite pattern. It includes the NS model review from Service component to Resource Composite and change of Modeling Domain (Composite Pattern UML diagram) The ResourceComposite includes below sub-requirements:
| SDC(->) VNFSDK | VoLTE CCVPN | CMCC Huawei ZTE Vodafone AT&T Verizon Intel | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: High Verizon-High | |
VNF instance (run time) | Run time model of a VNF instance (low) | A&AI | VoLTE CCVPN 5G vCPE | CMCC Huawei ZTE AT&T Verizon | CMCC Huawei ZTE | CMCC: High Vodafone: High AT&T: High Verizon-High | Kevin Scaggs (AT&T) | |
Infrastructure | ||||||||
Telemetry |
Experimental
Modeling Domain | Modeling Requirement | Modeling Requirement Description | Impacted Projects | Use Case Relevance | Modeling Spec Commitment | Code Commitment | Provider Priority | Owner |
---|---|---|---|---|---|---|---|---|
Resource | Container | Resource modeling changes in the IM, design time DM and runtime DM | Multi-Cloud | Intel | Intel | |||
Acceleration Management (BoF) | Discussing the requirement for acceleration management in ONAP, including research motivation,problem statement, as well as proposals. Welcome to join this thread. | Lei Huang |