Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Table of Contents
outlinetrue

Overview

Project NameEnter the name of the project
Target Release NameBeijing
Project Lifecycle StateIncubation
Participating Company China Mobile ,ZTE, Huawei,Nokia ,VMware,Boco,Jio,raisecom.

Scope

What is this release trying to address?

...

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Functionality Name

In or Out

Priority

Stretch

NS

LCM

Scaling

IN

H

NS

instance creation, NS instance termination

scaling

VNF Scaling

IN

H

VNF Scaling

VNF LCM (GVNFM)

IN

H

VNF deployment, termination

according to the VNF information model

VNF FCAPS

IN

M

Collection fcaps data from the EMS

Resource Granting

IN

H

Grant the resources requested from VNFMs

VNFM Integration

IN

H

Integration with specific VNFMs of vendors to deploy commercial VNFs

through GVNFM

VNF Integration(GVNFM)

IN

H

Integration with the VNF

NS LCM

EPA support?GVNFM?

IN

M

NS instance healing

NS LCM

OUT

M

NS instance scaling

Resource Granting

OUT

M

Intelligent monitoring, allocation and reservation resources based on the requirement of VNFs

Interface provided

IN

H

Provide restful interfaces  to Policy/SO/VID/portal

GVNFM EPA feature support

Integration with other projects(VF-C will consume the interfaces these projects provided ):

Functionality Name

In or Out

Priority

Stretch

VIM

OOM Integration

IN

H

Integration with

multi VIMs via Multi-VIM.

OOM

A&AI -IM Integration

In

M

Integration with A&AI- IM

SDC

Logging Integration

In

M

Integration with

SDCDCAE IntegrationInHIntegration with DACE to push vnf fcaps data to DACE

Logging

Epics

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox and issuetype in (epic)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable Name

Deliverable Description

To fill outTo fill out

NS/VNF Scaling API

NS/VNF Scaling API to So/Policy/UUI

Optimized NS/LCM API

Provide the Optimized NS/LCM API/UUI

Indirect mode proxy

Provide Indirect mode proxy function

EPA feature parse

Provide EPA feature parse function

GVNFM with improvement function

Provide GVNFM which can used to vFW/vLB use case


Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

...

Anyone reading this section should have a good understanding of all the interacting modules.

Image Added

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance


  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability


  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency


  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security


  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability


  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability


  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability


  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


  • API Incoming Dependencies

...

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • API Outgoing Dependencies

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

NameDescriptionVersion
To fill outTo fill outTo fill out

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

...

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out
  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

...

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out
  • Resources

Fill out the Resources Committed to the Release centralized page.

...

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out
  • Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...