Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Draft copy for proposal

Table of Contents
outlinetrue
Overview

Project NameEnter the name of the project
Target Release NameBeijing
Project Lifecycle StatePlanning
Participating Company Amdocs, AT&T,
ZTE
China Mobile, Huawei,
China Mobile
 Intel,
Boco
Nokia, Orange,
Intel
 ZTE

Scope

What is this release trying to address?

1. Platform maturity - enhance stability, performance, security etc. to strive for carrier-grade maturity.

2. New requirements:

a. Make ONAP SO carrier grade

b. **TBD**

Use Cases

SDC SO will contribute to support:

...

Use Case: VoLTE(approved)

SDC SO will continue to support:

...

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

Deliverable NameDeliverable DescriptionDeliverable Location
SO Docker ImagesExecutableDocker image available on nexus3
MariaDB Docker ImageExecutableDocker image available on nexus3
SO LibsJar filesAvailable on nexus
Deployment ScriptsChef recipes used to configure the Docker containers.

found on SO Git repositories

Sub-Components

List all sub-components part of this release. Activities related to sub-component must be in sync with the overall release.

...

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

Area

Actual Level

Targeted Level for current Release

How, Evidences

Comments

Performance0

0

(stretch goal - 1)


  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability0

1

(stretch goal - 2)


  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency1

1

(stretch goal - 2)



  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security0

1

(stretch goal - 2)


  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability0

0

(stretch goal - 1)


  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability0

1

(stretch goal - 2)


  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability0

1

(stretch goal - 2)


  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


API Incoming Dependencies

...

Prior to the delivery date, it is a good practice to organize an API review with the API consumers.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description

API Outgoing Dependencies

API this release is delivering to other releases.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description

Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected. List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

NameDescriptionVersion
To fill outTo fill out
CamundaAn open source platform for workflow and business process management

ARIA

Tosca parser and TOSCA workflow engine

JBOSS

An open source application server program

MariaDB

One of the most popular open source database server
To fill out

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

...

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release. List identified release gaps (if any), and its impact.

Gaps identifiedImpact
To fill outTo fill out

Known Defects and Issues

Provide a link toward the list of all known project bugs.

...

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out

Resources

Fill out the Resources Committed to the Release centralized page.

...

It is not expected to have a detailed project plan.

DateProjectDeliverable
To fill outTo fill outTo fill out

Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...