  • Platform Maturity (i.e., S3P items)
    • Resiliency
      • Level 1 - test only based on the work from Beijing
      • DB Resiliency was a limitation in Beijing due to the Active/Standby nature of MySQL. MariaDB w/Galera provides an active-active clustered configuration, which will support local fail-over.
    • Scalability
      • Level 0
      Scalability
      • Level 1 will be a regression run on Casablanca release - anticipate this to be test only
    • Stability 
      • Level 1 will be a regression run on Casablanca release - anticipate this to be test only
      • Level 2 requirement is expected to be covered by the Integration team.
    • Security 
      • Required Level 1
      • reach CI bagging passing level
      • encrypted communication enable https support. sdc will work in a mixe mode http interface will continue working but internal comunication will be done using https.
      • aaf integration is a strach goal based on the a risk from portal.Address outstanding items related to CII Passing Badge:
      • Clearing Critical and Medium Nexus IQ Security alerts to the extent possible, Including no critical and high known vulnerabilities > 60 days old.
      • Addressing  security-related items from Passing Badge related to encryption
    • Performance
      • level 0 no work required.
    Support new LCM action Reboot and various other enhancements to existing LCM actions (Tracked under Epic: APPC-899)
    • Manageability
      • level 1
      • align with onap logging spec 1.2
    • Usability
      • level 1
      • User guide created update
      • Deployment documentation update
      • API documentation update
      • All new API’s must adhere to the ONAP API Common Versioning 
  • Documentation updates (readthedocs) for Casablanca, such as, but not limited to:
    LCM API Guide
    • Release Notes.
    • enhance the available documentation to cover more of the application functionality and usability.
  • functional requirments:
  • HPA
    • SDC will support the work done to support HPA in ONAP with the help from intel. 
  • Change Management
    • SDC will support the work being done for the change management work
    • SDC will enhance our capability in designing workflows and complete the E2E flow between SDC and so with the help from Amdocs.
  • Scaling
    • SDC will support the work being done for the scaling work
  • 5G/PNF
    • the PNF support in sdc will be based on the capabilities from Beijing , no additional work is planned.
  • Architecture Alignment
  • sdc will start creating 
  • HEAT support
  • Testing
  • enchancentsCode Coverage for CDT (Javascript) - TBD, no commitment at this stage
  • Use Cases
    • ConfigScaleOut - Partially supported 
      • Support Retrieval of configuration data from AAI instead of having SO pass configuration data in payload - (investigate if we can we reuse the named query)
        • Dependency on SO to pass the vf-module-id of the vDNS instance that must be added.
        • Assumption is that AAI data needed is available
      • No commitment on Controller Type since requirements are still unclear.
    • Change Management - No Commitment