Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Upgrade and changes of the configuration data of participants
  • Addition of or removal of participants in an Control Loop
  • Upgrade of software in one or more participants in an Control Loop
  • Maintenance of compatibility between participants when an update of more than one participant must be done  together to ensure compatibility, for example, when a protocol being used by two participants to communicate is upgraded


5: Goals

5.1: 

  • Design of Management Apps
  • Specifying the source data
  • Specifying the analytics, machine learning, and AI algorithms they want to use in their App
  • Specifying the policies that govern the App
  • Specifying the format, parameters, and mechanisms required to allow the App to autonomically adjust the network
  • Preparing and specifying use cases to demonstrate the applicability of Management Apps
  • Life cycle management of Management Apps
  • Deployment of Apps
    • Bringing the App itself and all its constituent components to life
    • Stitching the data links between the components in the App together
    • Initiating generation of the data that triggers the App to execute
  • Updating of Management Apps
    • Allowing the parameters, algorithms, policy, of controller configuration data to be modified on executing Apps
  • Deletion of Apps
  • Life cycle management is demonstrated using the use cases specified in the design phase
  • Monitoring and analysis of Management Apps
  • Specification of metrics for monitoring and analysis
  • Allowing general App data and data specific to particular Apps to be collected at run time
  • Storing of the monitored data
  • Running general App algorithms or algorithms for specific components of Apps on the monitored data to ensure that the Apps are running correctly and optimally
  • Feedback of App performance results to users
  • Allowing the autonomic Apps themselves to have autonomic self-healing.
  • Monitoring and analysis is demonstrated using the use cases developed in the project

5.2: MVP

  • Design Time Service support multiple control loops
  • Enable flow between design time and run time services
  • Enable instantiation of a control loop towards ONAP components

...