Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Deferred Event Based to El Alto

Functional Requirements 

Functional RequirementsOwner

Projects Impacted

for CasablancaDublin

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)?

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
Ease of creating analytic components and on-boarding DCAE micro services

Vijay Venkatesh Kumar

Adam Krysiak

  • Need help from SDC

Control Loop Sub Committee

SDC (DCAE-DS)

CLAMP

DCAE

POLICY

Defining and Modeling Control Loop for LCM Operations
Volunteer?
Control Loop Sub Committee
Control Loop for LCM OperationsEvent based Common API for Control Loop Operations

Pamela Dragosh

Control Loop Sub Committee

Policy

CLAMP

SO

APPC

Ease of creating analytic components and on-boarding DCAE micro services







vFirewall Use Case Upgrade

Marco Platania

Pamela Dragosh

Volunteer?

Control Loop Sub Committee

SDC (DCAE-DS)

CLAMP

DCAEPOLICYPOLICY

APPC

vFirewall Use Case Upgrade
Volunteer?
Control Loop Sub Committee








Model Driven Control Loop Design

SDC

DCAE

Policy

CLAMP

 Model driven Control Loop Design

CLAMP

POLICY

APPC