  1. Need to use a new (shared) Hazelcast map with ModuleSetTags as key (value list of module refs) that have been processed (but not saved yet) to be used both inside a batch and different instance to prevent unnecessary trips to DMI/Node
  2. Watchdog needs to use Lock state AND lock reason to determine what node need to be upgraded
  3. Initial inventory and upgrade is not likely to happen at the same time but watchdog can handle both, of course performance would be affected if that does occur
  4. CACHE(s) needs to be cleared or updates as algorithm wil re-use existing schema set name
  5. Create new upgrade specific methods and reuse/slightly duplicate initial inventory methods
  6. Legacy (and new) checks for lock need to check the lock-reason too now! To differentiate between failed initial inventory and upgrade
  7. Probably need more specific (new) failure reasons to differentiate between initial inventory and upgrade failures
  8. as usual: small commits, early reviews to introduce all this functionality are advised, posisbel steps
    1. set lock state and reason upon request
    2. watch dog just list to be upgrade node (and does not mix them up with failed initial inventory)
    3. perform first upgrade for a new ModuleSetTag
    4. introduce and use new Hazelcast map
    5. perform upgrade of an node with a modueleSetTag that is already in cache
    6. perform upgrade of an node with a modueleSetTag that is already in DB (ie introduce DB query)
    7. handle failure of upgrade (re-use same retry mechanism as initial inventory but with different lock reason!)
    8. etc.

Proposed JIRAs

Upgrade anchor to new yang schema set (CPS-Core) Duplicate of #1

PriorityComponent DescriptionJIRAEstimates
1CPS CoreExpose a java interface to update schema set

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1800

5 Days
2NCMPUpdate existing REST endpoint add operation to upgrade YANG schema set using moduleSetTag

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1798

15 Days
3NCMPUpgrade inventory YANG model to store moduleSetTag

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1804

5 Days
4NCMPUse moduleSetTagCache to be cleared or updates as algorithm wil re-use existing schema set name

Jira
serverONAP Jira
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1821

5 Days
5NCMPUpdate cmhandle state (lock) during YANG model upgrade

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1801

5 Days
6NCMPModify existing inventory operations using moduleSetTag as optional attribute

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1803

15 Days
7NCMPIdentify and test error scenarios 

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1802

5 Days
8NCMPUpdate DMI Stub for testing purposes and add CSIT test 

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1806

5 Days
9NCMPTest and document performance of updating YANG schema set API.

Jira
serverONAP Jira
columnIdsissuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCPS-1805

10 Days

Planning:

  • Allow for 2 more user stories each may take 1 week. 
  • Estimated date of completion is   based on 1 person working. There is a possibility that 1 more person will join in between for implementation but there is no clear visibility on when the person can start contributing as of now. 
  • These are estimates and should not be interpreted as commitments. 

...