The assumption is there are 100 modules in each moduleSet and a moduleSet is available from a dmi plugin within 0.5 seconds. Also assume there is a 90% overlap in modules across all CM Handles. Across 20,000 Nodes there are 10 different ModuleSetTags
2
Request Frequency Upgrade to already existing moduleSetTags