...
(5G) FM/PM
Minimum Viable Product
SDC:
deliver all the need dockers and DB needed to support sdc functionality and the needed scripts for deploying it in HEAT heat and in OOM.
WORKFLOW:
deliver all the need dockers needed to support workflow designer functionality and the needed scripts for deploying it in HEAT heat and in OOM.
SDC SDK's:
sdc-destribution-client
sdc-tosca
Functionalities
List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.
...
Jira server ONAP JIRA columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution maximumIssues 20 jqlQuery project=SDC and issuetype in (story) and fixVersion="Frankfurt Release" serverId 425b2b0a-557c-3c0c-b515-579789cceedb
Longer term roadmap
SDC aims to position itself as the main design IDE in ONAP. SDC works towards creating a fully model-driven design experience.
Release Deliverables
Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.
Deliverable Name | Deliverable Description |
---|---|
SDC Docker Images | To fill outTo fill out |
SDC TOSCA | |
SDC distribution client |
Sub-Components
List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.
Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.
- Jtosca
- SDC Tosca
- SDC Distribution Client
- SDC base docker
- SDC titan cassandra
- SDC workflow designer
Architecture
High level architecture diagram
At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.
Indicate where your project fit within the ONAP Architecture diagram.
Block and sequence diagrams showing relation within the project as well as relation with external components are expected.
Anyone reading this section should have a good understanding of all the interacting modules.
Platform Maturity
Please fill out the centralized wiki page: Frankfurt Release Platform Maturity
...
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) | |||||
---|---|---|---|---|---|---|---|---|---|
Portal | user management APIs | api for user management | delivered | exposed by portal sdk | |||||
Destribution client | apis for retriving artifacts from catalog | download artifacts | delivered | exposed by sdc part of external apis. | To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out | Link toward the detailed API description |
API Outgoing Dependencies
...
API Name | API Description | API Definition Date | API Delivery date | API Definition link (i.e.swagger) | |||||
---|---|---|---|---|---|---|---|---|---|
dmaap | using Cambria client | api for pushing and retrieving notifications | delivered | sdk | To fill out | High level description of the API | Date for which the API is reviewed and agreed | To fill out | Link toward the detailed API description |
Third Party Products Dependencies
Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).
Name | Description | Version | |||
---|---|---|---|---|---|
Cassandra | Open-source distributed storage system | 2.1.19 | |||
Docker | VM container | ||||
JanusGraph | Open-source, distributed graph database | 1.0.0 | |||
Jetty | Open-source application server |
| |||
Ubuntu | Open-source software operating system | 16.0.4-LTS | |||
vnc | vnc server used for ui testing |
| To fill out | To fill out | To fill out |
In case there are specific dependencies (Centos 7 vs Ubuntu 16. Etc.) list them as well.
...
Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.
- validate uses cases and pairwise testing of SDC with other components
- enhance CSIT to include more tests
Gaps
This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.
...
Please update any risk on the centralized wiki page - Frankfurt Risks
Resources
Fill out the Resources Committed to the Release centralized page.
Release Milestone
...