You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Current »

Please find below the Minutes of Meetings and recording for the  SECCOM meeting that was held on 14th of April 2020.

Jira No
SummaryDescriptionStatusSolution

Zoom security issues 

Orange team is allowed to participate in the zoom meetings but not to lead them (it woud require installation of zoom client.




Latest feedback received from Integration team

Amy made w Wiki. 

Some the part of docker tests need to be part of Jenkins jobs. It might be thta we will be responsible for the scripts and OOM team to get it into the place (intehrated into the Jenkins build). 



Sylvain is acting PTL in OOM.


For the only HTTP port exposed - action Amy – to contact PTL Bharath. - no OJSI ticket assigned as it should have appeared after our scans or component was not responding at the scanning moment. No value to open an additional tickets. MUSIC team should either: remove http, switch to https or ask for a waiver with justification.


Virtual ONAP event
  • SECCOM Guilin security requirements update - Paweł
  • Holistic view of ONAP security – Krzysztof/Amy
    • Access control
    • Storing permission
    • Hardening
    • Logging 
    • Gaps identified
  • Akraino reference for security documentation - Amy
  • CNTT alignment meeting – to be consulted with Samuli
  • Service Mesh – analysis and then with Architecture Subcommittee - Krzysztof
  • Logs management evolution in ONAP - Pawel
  • VNF security requirements - Amy
  • Package upgrade strategy – Amy/Pawel
  • Communication matrix - Natacha
  • Password removal continued and no hardcoded passwords for a new code - Krzysztof
  • NEW: CMPv2 in Guilin release – Pawel B







We should come back to Architecture Subcommittee with a proposal for Service Mesh and once approved we should apprach TSC for a recommendation.


PTLs meeting update

PTLs meeting (held on April 13th) update:

-CLI closed 3 http ports and one of the CVEs and running as root

-A&AI should Close 15 issues

-AAF – still one issue open

-Optimization – 1 running as root – under fix - submitted

-MUSIC – https port exposed – delivered 

-Code coverage – 5 exceptions not reaching 55% (all with waiver granted: AAF no resouces for side car, Policy engine will be excluded next release, OOF – no resources)

-API documentation presentation by Andy Mayer




To approach David to check who would open Jira tickets per project for package upgrades.




Scorecard for requirement req-223

David proposed to descope this requirement.

Progress is minor but SECCOM porposes to keep this requirement as in scope.


Tony - to update scoorecard with green status and comment on minor but positive direction.

Security teast with Integration team

Amy will present relevant tests to next Integration team meeting on Wednesday.

Proposed tests: Integration and Built Tests For Releases


To check with OOM team whether Integration or SECCOM should do adding new Jenkins jobs for CIS tests - it should be a part of OOM verify job - those tests should be ran if container changes or even all the time.


Service Mesh risk analysis – meeting summary available here

Service mesh requirements from security perspective followed by risk analysis. Review with Chaker  




Jonathan finally resigned from PTL's position for AAFJohn Franey is occupied with other activities and not only with AAF.


 OUR NEXT SECCOM MEETING CALL WILL BE HELD ON 28th OF APRIL'20 as on 21st we have vF2F meetings.







  • No labels