Integration Blocking Issues with No Workaround

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh


Other Integration High Priority Issues

Key Summary Created Updated Assignee Reporter P Status Labels
Loading...
Refresh

"High" and "Highest" defects for the El Alto release

Total: 1 . Chart by: Status
 
Total: 1 . Chart by: Project

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh


ALL defects for the El Alto release

Total: 4 . Chart by: Status
Total: 4 . Chart by: Priority



Total: 4 . Chart by: Project


Cumulative Created vs Resolved over the last 15 days

This chart displays the cumulative created bugs (in red) versus the cumulative resolved Highest/High bugs (in green) over the last 15 days.

Ultimately, on the right side of the chart the green line should reach the red line - this indicates we've addressed all the "highest" and "high" priority defects in the release.

Issues: 0 created and 0 resolved
Period: last 15 days (grouped daily)


Recently Created Chart - Last 15 days

This chart is a derivative from the above “Created vs Resolved Chart”, and displays the number of created Highest/High bugs.

The red line represents the number of unresolved bugs, the green line represents the number of resolved bugs.

These are the same data point as the above chart, it is just another way to look at things. Ultimately, this chart should all be green.

Issues: 0 created and 0 resolved
Period: last 15 days (grouped daily)



  • No labels