Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

SON Use Case Montreal Release R13 Requirements : Slide deck:  ONAP_SON_R13_Requirements_20230704.ppt


An overview of the R13 Montreal release enhancements for the SON Use Case is given in the above deck.

Below are the major development activities that we will be doing in the Montreal release.

  • Convert RAN Simulator from docker based deployment with the k8s pod deployment.
  • Create Helm charts for RAN Simulator and Honeycomb servers.
  • Integrate RAN SIM Helm chart with the OOM Deployment.
  • Create CDS based workflows for Honeycomb Day-1 Config updates.
  • Carryover London release CM update work.

LFN-DTF February 16, 2023 / Radio Access Network Function Configuration Management (CM) Update in ONAP Montreal Release

Link: 2023-02 - ONAP: Radio Access Network Function Configuration Management (CM) Update in ONAP London Release - LF Networking - LF Networking Confluence

Slides (ppt): 20230216_LFN_DTF_Network_CM_Update.pptx

Slides (pdf): 20230216_LFN_DTF_Network_CM_Update.pdf

Recording: 20230216_LFN_DTF_Network_CM_Update_video.mp4


Figure 1 shows the overall architecture of the SON Use Case, with the Montreal release enhancements shown in Figure 2.

For the R13 Montreal release, the plan is to complete the CM Update Notification flow and deploy RAN SIM as part of OOM deployment.

Montreal release global use case requirement:
 

[REQ-1537] 5G SON use case enhancements for Montreal release - ONAP JIRA


There are two new use case requirements:

1. 5G SON/Automation use case enhancements CPS for Montreal release

[CPS-1713] 5G SON/Automation use case enhancements CPS for Montreal release- ONAP JIRA

[CPS-1407] Update CPS DB based on CM VES message for SON Use Case - ONAP JIRA

Modules: CPS, SDN-C, use existing DCAE VES Collector:
Description: Complete the CM update flow - set up CPS DB, process the CM VES message published by the VES Collector, update CPS DB.


2. Enhancements for RAN-Sim for Montreal release

[INT-2241] Enhancements for RAN-Sim for Montreal release- ONAP JIRA


Image Added

Figure 1: SON Use Case flow for O1-based and A1-based control loop actions actions in ONAP Rel 11.



Image Added


 Figure 2: Focus of Montreal release is the completion of  "CM VES event message generation and CPS DB update based on CM VES event message flow".