...
Functional Requirements | Owner | Projects Impacted for Casablanca | Links | Priority (from SP perspective) |
---|---|---|---|---|
HPA | VNFSDK (minor), SDC (minor), Policy, OOF (minor), SO (minor) | Orange: 2 ATT: 2 China Telecom: 2 China Mobile: 1 Verizon: 2 Vodafone: 2 | ||
Change Management | SDC, SO, VID, SDNC, APPC, VNFSDK, OOF | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | ||
Scaling | Link to Slides | Orange: 1 ATT: 1 China Telecom: 1 China Mobile: 1 Verizon: 3 Vodafone: 1 | ||
5G/PNF | SDC, SO, DCAE, SDN-C, App-C, A&AI, CDT, Modeling | Orange: 2 ATT: 1 China Telecom: 3 China Mobile: 1 Verizon: 1 Vodafone: 2 | ||
5G/performance Analysis and Optimization | DCAE, OOF, SDN-R | Orange: 2 ATT: 2 China Telecom: 1 China Mobile: 3 Verizon: 3 Vodafone: 3 | ||
5G/Network slicing | Withdrawn from Casablanca release by the requirement owner | Orange: 3 ATT: 3 China Telecom: 1 China Mobile: 2 Verizon: 2 Vodafone: 3 | ||
Centralized Representation and Consistent ID of Cloud Regions | SO,VID,SDNC,OOF,VFC, UUI,MultiCloud, DCAE, DMaaP, Integration | Centralized Representation and Consistent Identification of Cloud Regions In ONAP | Orange: 1 ATT: 2 China Telecom: 2 China Mobile: 3 Verizon: 1 Vodafone: 1 | |
EA/Cloud Infrastructure for Distributed Edge Clouds (5G etc.) | Policy, Multi-Cloud, A&AI, ESR, OOF, SO, DCAE, OOM (minor) | Orange: 3 ATT: 3 China Telecom: 3 China Mobile: 3 Verizon: 2 Vodafone: 1 |
...