Use Cases
Use Case | Owner | Projects or functional requirements Impacted for Casablanca | Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any) | Dependency (from/to) another project(s) | T-Shirt Size (XS, S, M, L, XL)* | Project's Impact: Test Only (TO), Code (C) | Committed (C)/Partially Committed (P) or not (N) per Impacted projects | If Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc) | Company Engagement | Notes |
---|---|---|---|---|---|---|---|---|---|---|
vFW | AT&T | HPA | All: Test Only | N/A - part of regression tests | N/A - part of regression tests | |||||
vDNS | AT&T | HPA | All: Test Only | N/A - part of regression tests | N/A - part of regression tests | |||||
VoLTE | China Mobile | HPA | All: Test Only | N/A - part of regression tests | N/A - part of regression tests | |||||
vCPE | Kang Xi | HPA | All: Test Only | N/A - part of regression tests | N/A - part of regression tests | |||||
CCVPN | DCAE, SO,...? NOTE: No project should be code impacted by this use case. | Materials Lin Meng. Material Jianguo Zeng | All; Test Only | China Mobile, Vodafone | Contingent that Use Case owner are able to add resources on impacted projects and Integration agreement | |||||
OSAM/PNF | SO, Portal, External API, APPC, DCAE HPA **NOTE: Based on Arch review, no projects should be code impacted VNFRQTS (include PNFs) | OSAM Material | All: Test Only | ATT, Turk Telecom, Swisscom | OSAM uses the PNF capability similar to 5G use case. No new efforts were identified to support OSAM using PNF. Contingent that Use Case owner are able to add resources on impacted projects and Integration agreement |
T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team
- XS - <4 Man/Weeks;
- S - ~6 Man/Weeks;
- M - ~8 Man/Weeks;
- L - ~12 Man/Weeks;
- XL - > 12 Man/Weeks.
Functional Requirements
Functional Requirements | Owner | Projects Impacted for Casablanca | Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any) | Priority (from SP perspective) | Dependency (from/to) another project(s) | T-Shirt Size (XS, S, M, L, XL)* | Project's Impact: Test Only (TO), Code (C) | Committed (C)/Partially Committed (P) or not (N) per Impacted projects | If Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc) | Company Engagement | Notes |
---|---|---|---|---|---|---|---|---|---|---|---|
HPA | VNFSDK (minor), SDC (minor), Policy, OOF (minor), SO (minor) VNFRQTS | HPA Enhancements (For Casablanca Release) | Orange: 2 ATT: 2 China Telecom: 2 China Mobile: 1 Verizon: 2 Vodafone: 2 | Policy: on SDC | |||||||
Change Management | SDC, SO, VID, SDNC, APPC, VNFSDK, OOF, VF-C VNFRQTS | Link to Slide | Orange: 1 ATT: 1 China Telecom: 2 China Mobile: 2 Verizon: 1 Vodafone: 2 | VID: on OOF, SO | Code: APPC, SO,SDN-C, OOF, VID,SDC | VID: Not committed APPC: Not committed SDC: committed based on Amdocs contribution | VID: requires additional design information | AT&T | |||
Scaling | SO, APPC, VF-C, CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF VNFRQTS | Link to Slides | Orange: 1 ATT: 1 China Telecom: 1 China Mobile: 1 Verizon: 3 Vodafone: 1 | CLAMP: depend on Policy VID: on SO APPC: on SO Policy: on SO | VID: XS CLAMP: M | Code: SO, APPC, CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF Test Only: SDC | CLAMP: Committed with risks (see dependency) VID: Committed APPC: Partially Committed Policy: Committed with risks (TBD) | APPC: Only committing to requirement to retrieve configuration data from AAI; | AT&T | ||
5G/PNF | SDC, SO, DCAE, SDN-C, App-C, A&AI, CDT, Modeling, VID VNFRQTS | Link to Slide | Orange: 2 ATT: 1 China Telecom: 3 China Mobile: 1 Verizon: 1 Vodafone: 2 | VID: on SO | VID: S | Code: VID Test Only: SDC | VID: Not Committed APPC: Not Committed | VID: Additional information required | |||
5G/performance Analysis and Optimization | DCAE, OOF, SDN-R | Orange: 2 ATT: 2 China Telecom: 1 China Mobile: 3 Verizon: 3 Vodafone: 3 | |||||||||
5G/Network slicing | Withdrawn from Casablanca release by the requirement owner | Orange: 3 ATT: 3 China Telecom: 1 China Mobile: 2 Verizon: 2 Vodafone: 3 | |||||||||
Centralized Representation and Consistent ID of Cloud Regions | SO,VID,SDNC,OOF,VFC, UUI,MultiCloud, DCAE, DMaaP, Integration | Centralized Representation and Consistent Identification of Cloud Regions In ONAP | Orange: 1 ATT: 2 China Telecom: 2 China Mobile: 3 Verizon: 1 Vodafone: 1 | VID: on SO | VID: S | code : SO,VID,SDNC,OOF,VFC, UUI,MultiCloud, Integration Test: DCAE, DMaaP | VID: Committed | ||||
EA/Cloud Infrastructure for Distributed Edge Clouds (5G etc.) | Policy, Multi-Cloud, A&AI, ESR, OOF, SO, DCAE, OOM (minor) | Orange: 3 ATT: 3 China Telecom: 3 China Mobile: 3 Verizon: 2 Vodafone: 1 |
T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team
...