The Requirements extracted from SP lists of priorities for Casablanca are covered either by the Use Case, the functional requirements, the non functional requirement or within a project scope of work.

Use Cases

Use CaseOwner

Projects or functional requirements Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)Dependency (from/to) another project(s)T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
vFWAT&THPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests

vDNSAT&THPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests

VoLTE

China Mobile

HPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests

vCPEKang XiHPA


All: Test OnlyN/A - part of regression testsN/A - part of regression tests

CCVPN

DCAE, SO,...?

NOTE: No project should be code impacted by this use case.

Materials Lin Meng. Material Jianguo Zeng

All; Test Only

China Mobile, Vodafone

Contingent that Use Case owner are able to add resources on impacted projects and Integration agreement

OSAM/PNF

SO, Portal, External API, APPC, DCAE

HPA

**NOTE: Based on Arch review, no projects should be code impacted

VNFRQTS (include PNFs)

OSAM Material

All: Test Only

ATT, Turk Telecom, SwisscomOSAM uses the PNF capability similar to 5G use case. No new efforts were identified to support OSAM using PNF. Contingent that Use Case owner are able to add resources on impacted projects and Integration agreement

(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

  • XS - <4 Man/Weeks;
  • S - ~6 Man/Weeks;
  • M - ~8 Man/Weeks;
  • L - ~12 Man/Weeks;
  • XL - > 12 Man/Weeks.


Functional Requirements

Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
HPA

VNFSDK (minor), SDC (minor), Policy, OOF (minor), SO (minor)

VNFRQTS

HPA Enhancements (For Casablanca Release)

Orange: 2

ATT: 2

China Telecom: 2

China Mobile: 1

Verizon: 2

Vodafone: 2

Policy: on SDC





Change Management

SDC, SO, VID, SDNC, APPC, VNFSDK, OOF, VF-C

VNFRQTS

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2

VID: on OOF, SO
Code: APPC, SO,SDN-C, OOF, VID,SDC

VID: Not committed

APPC: Not committed

SDC: committed based on Amdocs contribution

VID: requires additional design informationAT&T
Scaling

SO, APPC, VF-C, CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF

VNFRQTS

Link to Slides

Orange: 1

ATT: 1

China Telecom: 1

China Mobile: 1

Verizon: 3

Vodafone: 1

CLAMP: depend on Policy

VID: on SO

APPC: on SO

Policy: on SO

VID: XS

CLAMP: M

Code: SO, APPC,  CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF

Test Only: SDC

CLAMP: Committed with risks (see dependency)

VID: Committed

APPC: Partially Committed

Policy: Committed with risks (TBD)


APPC: Only committing to requirement to retrieve configuration data from AAI;

AT&T
5G/PNF

SDC, SO, DCAE, SDN-C, App-C, A&AI, CDT, Modeling, VID

VNFRQTS

Link to Slide

Orange: 2

ATT: 1

China Telecom: 3

China Mobile: 1

Verizon: 1

Vodafone: 2

VID: on SOVID: S

Code: VID

Test Only: SDC

VID: Not Committed

APPC: Not Committed

VID: Additional information required

5G/performance Analysis and OptimizationDCAE, OOF, SDN-R

Orange: 2

ATT: 2

China Telecom: 1

China Mobile: 3

Verizon: 3

Vodafone: 3








5G/Network slicingWithdrawn from Casablanca release by the requirement owner

Orange: 3

ATT: 3

China Telecom: 1

China Mobile: 2

Verizon: 2

Vodafone: 3








Centralized Representation

and Consistent ID of Cloud Regions

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud, DCAE,

DMaaP, Integration

Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1

VID: on SOVID: Scode :

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud, Integration

Test: DCAE, DMaaP

VID: Committed


EA/Cloud Infrastructure for Distributed Edge Clouds (5G etc.)Policy, Multi-Cloud, A&AI, ESR, OOF, SO, DCAE, OOM (minor)

Edge Scoping MVP for Casablanca - ONAP Enhancements

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1








(star) T-Shirt Size: Ballpark estimation for assessing the development/testing activities performed by the project team; not the integration team

...