Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
HPA

VNFSDK (minor), SDC (minor), Policy, OOF (minor), SO (minor)

VNFRQTS

HPA Enhancements (For Casablanca Release)

Orange: 2

ATT: 2

China Telecom: 2

China Mobile: 1

Verizon: 2

Vodafone: 2

Policy: on SDC

OOF: on AAI, Policy


Code: Policy, OOF

Policy: Partially

OOF: Committed

Policy: Resources




Change Management

SDC, SO, VID, SDNC, APPC, VNFSDK, OOF, VF-C

VNFRQTS

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2

VID: on OOF, SO

SDC: on SO


Code: APPC, SO,SDN-C, OOF, VID,SDC

VID: Not committed

APPC: Not committed

SDC: committed based on Amdocs contribution

SDN-C: committed

OOF: Not Committed

VID: requires additional design information

APPC: Not enough details on requirements, plus limited resources

OOF: Resources to be worked out

AT&T
Scaling

SO, APPC, VF-C, CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF

VNFRQTS,SDC

Link to Slides

Orange: 1

ATT: 1

China Telecom: 1

China Mobile: 1

Verizon: 3

Vodafone: 1

CLAMP: depend on Policy

VID: on SO

APPC: on SO

Policy: on SO

OOF: on MultiCloud, Policy

VID: XS

CLAMP: M

AAI: XS

OOF: S

Code: SO, APPC,  CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF


CLAMP: Committed with risks (see dependency)

VID: Committed

APPC: Partially Committed

Policy: Committed with risks (TBD)

AAI:

Committed

OOF: Partially committed

SDN-C: committed

APPC: Only committing to requirement to retrieve configuration data from AAI; Support for Controller Type currently a stretch goal until requirement are more defined

OOF: Limited resources; if R2 homing workflows need to be enhanced.

SDC: waiting on controller type decision

AT&T
5G/PNF

SDC, SO, DCAE, SDN-C, App-C, A&AI, CDT, Modeling, VID, OOF

VNFRQTS

Link to Slide

Orange: 2

ATT: 1

China Telecom: 3

China Mobile: 1

Verizon: 1

Vodafone: 2

VID: on SO


VID: S

AAI: XS? need clarification on what's expected

OOF: need clarification on requirements for RAN VNF Homing

DCAE: S

Code: VID

Test Only: SDC

Code : DCAE

VID: Not Committed

APPC: Not Committed

AAI: Not Committed

OOF: Partially Committed

SDNC: committed

DCAE: Partially Committed


VID: Additional information required

APPC: Per review of slides, does not appear to be anything specific for APPC in Casablanca. Items mentioned are more longer term, roadmap items

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

OOF: Additional information required on policies required for RAN VNF Homing

DCAE: Additional information required

AT&T, Nokia,
5G/performance Analysis and OptimizationDCAE, OOF, SDN-R, CCSDK, SDNC

Orange: 2

ATT: 2

China Telecom: 1

China Mobile: 3

Verizon: 3

Vodafone: 3


OOF: M

DCAE: XL

code change: OOF

DCAE:Code

CCSDK: committed

SDN-C: committed

OOF: Partially committed

DCAE: Partially committed

OOF: Limited resources

5G/Network slicingWithdrawn from Casablanca release by the requirement owner

Orange: 3

ATT: 3

China Telecom: 1

China Mobile: 2

Verizon: 2

Vodafone: 3








Centralized Representation

and Consistent ID of Cloud Regions

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud, DCAE,

DMaaP, Integration

Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1

VID: on SOVID: Scode :

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud, Integration

Test: DCAE, DMaaP

VID: Committed

OOF: Committed

SDNC: Not committed


SDNC: Limited resources



EA/Cloud Infrastructure for Distributed Edge Clouds (5G etc.)Policy, Multi-Cloud, A&AI, ESR, OOF, SO, DCAE, OOM (minor)

Edge Scoping MVP for Casablanca - ONAP Enhancements

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1

OOF: on MultiCloud, AAI

AAI: XS? need clarification on what's expected

OOF: M

code: OOFOOF: Partially committed

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

OOF: Limited resources



...