Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
HPA

VNFSDK (minor)
SDC (minor)
Policy
OOF (minor)
SO (minor)
AAI,
Multi-Cloud
VNFRQTS

HPA Enhancements (For Casablanca Release)

Orange: 2

ATT: 2

China Telecom: 2

China Mobile: 1

Verizon: 2

Vodafone: 2

VNFSDK: none

SDC: VNFSDK, VNFD model

Policy: SDC

OOF: SO, Policy, AAI

AAI: Multi-CLoud



VNFSDK (C)
SDC (TO)
Policy (C)
OOF (C)
SO (C/TO)
AAI (C)
Multi-Cloud (C)


Policy: Committed based on Intel providing resources

OOF: Committed

VNFSDK: Committed

SDC: committed based on Intel contribution.

SO: committed

AAI: TBD

Multi-Cloud: committed



Intel
ARM
AT&T
Huawei


Change Management

SDC, SO, VID, SDNC, APPC, VNFSDK, OOF, VF-C

VNFRQTS

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2

VID: on OOF, SO

SDC: on SO


Code: APPC, SO,SDN-C, OOF, VID,SDC

VID: Not committed

APPC: Not committed

SDC: committed based on Amdocs contribution

SDN-C: committed

OOF: Not Committed

VID: requires additional design information

APPC: Not enough details on requirements, plus limited resources

OOF: Resources to be worked out

SO : Committed (with support from ATT resources)

AT&T
Scaling

SO, APPC, VF-C, CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF

VNFRQTS,SDC

Link to Slides

Orange: 1

ATT: 1

China Telecom: 1

China Mobile: 1

Verizon: 3

Vodafone: 1

CLAMP: depend on Policy

VID: on SO

APPC: on SO

Policy: on SO

OOF: on MultiCloud, Policy

VID: XS

CLAMP: M

AAI: XS

OOF: S

Code: SO, APPC,  CLAMP, DCAE, Policy, OOM, VID, SDN-C, A&AI, Multi-VIM/Cloud, OOF




CLAMP: Committed with risks (see dependency)

VID: Committed

APPC: Partially Committed

Policy: Committed with risks (TBD)

AAI:

Committed

OOF: Partially committed

SDN-C: committed

DCAE: Not committed

APPC: Only committing to requirement to retrieve configuration data from AAI; Support for Controller Type currently a stretch goal until requirement are more defined

OOF: Limited resources; if R2 homing workflows need to be enhanced.

SDC: waiting on controller type decision

DCAE: From requirement, appears TO impact; need clarification as DCAE is noted as code impact.

SO:Committed

AT&T

5G/PNF

Plug and Play

SDC, SO, SDN-C, A&AI, CDT, Modeling, VID

Link to Slide

Orange: 2

ATT: 1

China Telecom: 3

China Mobile: 1

Verizon: 1

Vodafone: 2

VID: on SO



VID: S

AAI: XS? need clarification on what's expected

OOF: No impact


Code: VID

Test Only: SDC


VID: Not Committed

APPC: Not Committed

AAI: Not Committed

OOF: Partially Committed

SDNC: committed



VID: Additional information required

APPC: Per review of slides, does not appear to be anything specific for APPC in Casablanca. Items mentioned are more longer term, roadmap items

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

OOF: Additional information required on policies required for RAN VNF Homing

SO: Committed (with resurces from Nokia)


AT&T, Nokia,

5G/PNF

Software Version Reporting

 CCSDK, SDN-CLink to Slide



CCSDK: committed

SDN-C: committed


AT&T

5G/PNF

Lifecycle Management Support

 CLAMP, SDN-CLink to Slide





AT&T

5G/performance Analysis and Optimization

High Volume and RT Data Collection of PM

DCAE, SDN-R, CCSDK, SDNCLink to Slide

Orange: 2

ATT: 2

China Telecom: 1

China Mobile: 3

Verizon: 3

Vodafone: 3

DCAE: on DMAAP-DR, OOM

OOF: M

DCAE: XL


code change: OOF

Code : DCAE


CCSDK: committed

SDN-C: committed

OOF: Partially committed

DCAE: Partially Committed

OOF: Limited resources


DCAE:  Due to dependency (see notes) + and Edge deployment support for R3, DDS-VES and new analytic platform (flink) not committed due to resource constraint

AT&T, Nokia, Ericsson

DCAE will introduces 3 new services for this FR.

HV-VES  - Committed by Nokia

DataFileCollector- Committed by Ericsson(w/dependency on Dmaap-DR)

PM-Mapper - Stretch goal (also w/dependency on Dmaap-DR

5G/performance Analysis and Optimization

Bulk PM

 Oscar Malm



 DCAE, DMaaPLink to Slide


code change: DMaaP

Code change: DCAE



AT&T, Nokia, Ericsson

5G/performance Analysis and Optimization

Optimization Framework Enhancements (Placement, Formulation, Solving)

 OOF

Link to Slide

OOF: Mcode change: OOFOOF: Committed to SON
AT&T, Nokia, Reliance Jio ( ? )
5G/Network slicingWithdrawn from Casablanca release by the requirement owner

Orange: 3

ATT: 3

China Telecom: 1

China Mobile: 2

Verizon: 2

Vodafone: 3








Centralized Representation and Consistent ID of Cloud Regions

MVP (Plan B, Phase 1) : SO, Integration


Stretch goal (Plan B, Phase 2) : SO,VID,SDNC,OOF,VFC, UUI,MultiCloud.

Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1

VID: on SO

SO/OOF/VFC: MultiCloud

VID: S

MultiCloud: S

VFC:S

code :

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud, Integration


MVP (Plan B, Phase 1) :

  SO: committed

  Integration: committed


Stretch goal (Plan B, Phase 2) :

 SO: not committed

 VID: Not Committed

 SDNC: Not committed

  OOF: Committed

  MultiCloud:Committed 

  VF-C :Committed

  UUI: committed


SDNC: Limited resources



To align MVP, propose alternative action plan B: break this requirement into 3 phases.

Phase 1 is to centralize the representation of cloud regions;

Phase 2 is to apply consistent ID across all related ONAP projects.

Phase 3 is to correlate and align dcaeLocation to AAI's cloud region. This phase requires further discussion, hence not listed here.

EA/Cloud Infrastructure for Distributed Edge Clouds (5G etc.)Policy, Multi-Cloud, A&AI, ESR, OOF, SO, DCAE, OOM (minor)

Edge Scoping MVP for Casablanca - ONAP Enhancements

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1

OOF: on MultiCloud, AAI


AAI: XS? need clarification on what's expected

SO: S?

OOF: M

Multi-Cloud: M

Code: OOF, Multi-Cloud, SO, A&AI, DCAE

Casablanca MVP:

  • OOF: Committed
  • Multi-Cloud: Committed
  • SO: Committed
  • AAI: In progress

Stretch Goal:

  • DCAE : Not committed

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

DCAE: Need specifics on DCAE impact and depends on OOM multisite solution will be supported.



...