Functional RequirementsOwner

Projects Impacted

for Casablanca

Link(s) to High Level Design (HLD) /Low Level Design (LLD) (if any)

Priority

(from SP perspective)

Dependency (from/to) another project(s)



T-Shirt Size (XS, S, M, L, XL)*Project's Impact: Test Only (TO), Code (C)Committed (C)/Partially Committed (P) or not (N) per Impacted projectsIf Partially or not Committed, then what are the gaps per impacted project (people/FTEs; HLD/LLD; etc)Company EngagementNotes
HPA

VNFSDK (minor)
SDC (minor)
Policy
OOF (minor)
SO (minor)
AAI,
Multi-Cloud
VNFRQTS

HPA Enhancements (For Casablanca Release)

Orange: 2

ATT: 2

China Telecom: 2

China Mobile: 1

Verizon: 2

Vodafone: 2

VNFSDK: none

SDC: VNFSDK, VNFD model

Policy: SDC

OOF: SO, Policy, AAI

AAI: Multi-CLoud


VNFSDK: M
SDC
:XS
Policy: M
OOF: S
SO: S
AAi: S/M
Multi-Cloud: M 

VNFSDK (C)
SDC (TO/C)
Policy (C)
OOF (C)
SO (C/TO)
AAI (C)
Multi-Cloud (C)


Policy: Committed based on Intel providing resources

OOF: Committed

VNFSDK: Committed

SDC: committed based on Intel contribution.

SO: committed

AAI: committed

Multi-Cloud: committed



Intel
ARM
AT&T
Huawei


Change Management -
Flexible designer/orchestrator

SDC, SO, VID

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2

VID: on SO

SDC: on SO

SDC:XL

VID: M

Code: SO,VID,SDC

VID: Not committed (Note: VID part is "nice to have" - no dependency on VID from other projects)

SDC: committed based on Amdocs contribution

SO : Committed (with support from ATT resources)


VID: requires additional resources


AT&T
Change Management - traffic migrationSDNC, APPC, VNFSDKLink to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2


Code: SDNC, APPC

SDN-C: committed

APPC: Not committed

Orange: Committed

APPC: Not enough details on requirements, plus limited resourcesAT&T, Orange, Intel
Change Management - 5G PNF software upgradeAPPC, SO, SDC, A&AI, Ansible/EMLink to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2



SDC: Not committedSDC: missing information on requirements and designe.AT&T, China Mobile, Huawei
Change Management - CM scheduler

OOF, VID

VID - Nice to have - the functionality can still be delivered with OOF only (scheduler would need to be invoked through CLI)

Link to Slide

Orange: 1

ATT: 1

China Telecom: 2

China Mobile: 2

Verizon: 1

Vodafone: 2
VID on OOFVID: SCode: OOF, VID

OOF: Committed

VID: Not committed


OOF: Risk on resources -  being worked out

VID: requires additional resources

AT&T

Scaling

Closed Loop Scaling

(High Priority)

Policy, CLAMP, SO, DCAE


Link to Slides   

Orange: 1

ATT: 1

China Telecom: 1

China Mobile: 1

Verizon: 3

Vodafone: 1

   

CLAMP: on Policy

Policy: on SO

CLAMP: M

Code: SO, CLAMP, Policy

Test: DCAE




CLAMP: Committed with risks (dependency on Policy)

Policy: Committed with risks (TBD)

SO: Committed

DCAE: Committed


AT&T

Scaling

Beijing Fixes

(High Priority)

 Scott BlandfordAPPC, SDNC, SO, AAI, VID

 VID: on SO

APPC: on SO

VID: XS

AAI: XS

Code: APPC, SDNC, SO, AAI

AAI: Committed

APPC: Committed

SDNC: Committed

SO: Committed

VID: Committed


 AT&T

Scaling

Controller_Topic_ID

(Medium Priority)

 Scott BlandfordAPPC, Policy, SDC, SDNC, SO, VID

Undefined

APPC: Not Committed

Policy: Not Committed

SDC: Not Committed

SDNC: Not Committed

SO: Not Committed

Feature Design is not defined AT&T

Scaling

Homing and Capacity Check

(Low Priority)

 Scott BlandfordMulti-VIM, OOF, SDNC, SO OOF: on Multicloud and PolicyOOF: SCode: OOF, SO, SDNC, Multi-VIM OOF: Partially CommittedOOF: Resource issue if R2 solution needs to be extended for new policy constraints. AT&T

5G/PNF

Plug and Play

SDC, SO, SDN-C, A&AI, CDT, Modeling, VID

Link to Slide

Orange: 2

ATT: 1

China Telecom: 3

China Mobile: 1

Verizon: 1

Vodafone: 2

VID: on SO



VID: S

AAI: XS? need clarification on what's expected

OOF: No impact


Code: VID

Test Only: SDC


VID: Committed based on Nokia's contribution

SDNC: committed

SO: Committed (with resources from Nokia)

SDC: support based on current sdc capabilities from Beijing.

APPC: Not CommittedNo impact

AAI: Not Committed No code change, only modeling changes

OOF: Partially CommittedNo impact

APPC: Per review of slides, does not appear to be anything specific for APPC in Casablanca. Items mentioned are more longer term, roadmap items

AAI: Expecting this to be modelling/schema updates only but unclear. Need additional information and analysis by AAI SMEs

OOF: Additional information required on policies required for PNF placement

AT&T, Nokia,

5G/PNF

Software Version Reporting

 CCSDK, SDN-CLink to Slide



CCSDK: committed

SDN-C: committed


AT&T

5G/PNF

Lifecycle Management Support

 CLAMP, SDN-CLink to Slide





AT&T

5G/performance Analysis and Optimization

High Volume and RT Data Collection of PM

DCAE, SDN-R, CCSDK, SDNCLink to Slide

Orange: 2

ATT: 2

China Telecom: 1

China Mobile: 3

Verizon: 3

Vodafone: 3

DCAE: on DMAAP (native Kafka support)

OOF: M

DCAE: L


code change: OOF

Code : DCAE


CCSDK: committed

SDN-C: committed

OOF: Partially committedNo Impact

DCAE: Committed (based on Nokia contribution) with dependency risk

OOF: Limited resources


AT&T, Nokia,

DCAE: Edge deployment support for R3, DDS-VES and new analytic platform (flink) not committed due to resource constraint



5G/performance Analysis and Optimization

Bulk PM

 DCAE, DMaaPLink to Slide
DCAE: on DMAAP-DRDCAE:L

code change: DMaaP

Code change: DCAE

DCAE:

Partial Commit

  Data File Collection Committed

DMaaP – (Dependency on DMAAP-DR + PMMapper (Stretch goal based on Ericsson contribution) Not a hard requirement

DCAE: Dependency on DMAAP-DR + PMMapper (Stretch goal based on Ericsson contribution)


AT&T, Ericsson

DCAE:DataFileCollector- Committed (based on Ericsson Contribution)


5G/performance Analysis and Optimization

Optimization Framework Enhancements (Placement, Formulation, Solving)

 OOF

Link to Slide

OOF: Mcode change: OOFOOF: Committed to SON
AT&T, Nokia, Reliance Jio
5G/Network slicingWithdrawn from Casablanca release by the requirement owner

Orange: 3

ATT: 3

China Telecom: 1

China Mobile: 2

Verizon: 2

Vodafone: 3








Centralized Representation and Consistent ID of Cloud Regions,

Plan B, Phase 1: Centralized Representation of Cloud Regions

SO, Integration



Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1



code :

SO, Integration


  SO: committed based on Intel's contribution

  Integration: committed






To align MVP, propose alternative action plan B: break this requirement into 3 phases.

Phase 1 is to centralize the representation of cloud regions;

Phase 2 is to apply consistent ID across all related ONAP projects.

Phase 3 is to correlate and align dcaeLocation to AAI's cloud region. This phase requires further discussion, hence not listed here.

Note on "Intel's contribution": This is the synergy effort with HPA, no further special changes needed here. hence this can be deemed as a dependency on HPA's impact on SO.

Centralized Representation and Consistent ID of Cloud Regions,

Plan B, Phase 2: Consistent ID of Cloud Regions

SO,VID,SDNC,OOF,VFC, UUI,MultiCloud.Centralized Representation and Consistent Identification of Cloud Regions In ONAP

Orange: 1

ATT: 2

China Telecom: 2

China Mobile: 3

Verizon: 1

Vodafone: 1

VID/SDNC: on SO

SO/OOF/VFC: MultiCloud

VID: XS

MultiCloud: S

VFC:S

code :

SO,VID,SDNC,OOF,VFC,

UUI,MultiCloud

 SO: not committed

 VID: Not Committed

 SDNC: Not committed

  OOF: Committed

  MultiCloud:Committed 

  VF-C :Committed

  UUI: committed

SDNC: Limited resources

VID: requires additional resources



Edge Automation Through ONAP (EA)A&AI, Multi-Cloud, OOF, SO

Edge Scoping MVP for Casablanca - ONAP Enhancements

Orange: 3

ATT: 3

China Telecom: 3

China Mobile: 3

Verizon: 2

Vodafone: 1

OOF: on MultiCloud

Multi-Cloud: on A&AI



AAI: XS

SO: XS

OOF: M

Multi-Cloud: L

Code: OOF, Multi-Cloud, SO, A&AI

Test: Integration

Casablanca MVP:

  • OOF: Committed
  • Multi-Cloud: Committed
  • SO: Committed
  • A&AI: Committed

Casablanca Stretch Goal:

  • Discussion In Progress




...