Status: It has been passed the test at Nokia lab. Planned to start the test at TLab at 10/11/2018, but the lab was not readyAll pairwise testing has done at Windriver lab. Will do end to end at TLab.
5G - PNF PnP - Integration Test Cases: Marcin Przybysz Krzysztof Kuzmicki
...
Status: It has been passed the test at Huawei lab. Re-test it at Windriver lab. (Not started yet, not much dependency on other components)
Scale Out - Integration Test Cases and Status: Scott Blandford, Marco Platania
...
Status: Created policy, control loop, deploy control loop into dcae. (with http and https connections) (At this moment, HEAT). Testing with OOM based deployment: passed distribution and instantiation with walkaround DMAAP/CLAMP. (
Jira | ||||||
---|---|---|---|---|---|---|
|
Design closed loop for scale-out: PASS
Runtime for scale VF module (a working session at 10/24 afternoon).
CCVPN Integration Test Cases: Yang Xu
...
Status: Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.
Started install OOM with windriver, etc. lab's scripts, but it does not work at China. Trying to install it manually.
HPA & Cloud Agnostic Intent - R3 Test Plan: Itohan Ukponmwan
...