Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

vCPE Integration Test Case: Yang Xu

--@Windriver

Status: If use firefox browser, (on service design); going on (blocked by the portal port, need to change back to 8989:

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyPORTAL-436
Finished onboarding, instantiation. Now testing closed loop.

vCPE with TOSCA VNF Integration Test Case: Yang Xu / Itohan Ukponmwan

...

Intel: The testing has been started at Intel, and start testing at SB-06 with HPA.

CMCC: ?? 

ONAP deployment have finished

Device have been  ready and begin to install openstack  Pike which used to deploy VNF

Design time testing have started

5G - Real Time PM and High Volume Stream Data Collection - Integration Test CasesMarcin Przybysz Marek Pondel

...

Status: Ongoing. For test cases, please see Test aspects . New software modules being installed in OWL lab . Upgraded ONAP from Beijing to Casablanca. Doing PoC for C release, mostly related to Policy, OOF.

Latest: ???

5G - PNF Software Upgrade - Integration Test Cases: Yang Xu

...

Status: Demoed at ONS Europe. The optical equipment has delivered to CMCC, and they are manually testing the optical equipment.Started install OOM with windriver, etc. lab's scripts, but it does not work at China. Trying to install it manually.


Deploy ONAP using OOM  basically completed

Huawei sotn manual testing have completed

ZTE sotn manual testing begin

HPA & Cloud Agnostic Intent - R3 Test PlanItohan Ukponmwan

...