Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Do we need full blow OOF functionality for management component placement?
    1. Evaluate if Minizinc used CMSO is sufficient
    2. Key Considerations:
      1. Typically, management plane components don't need dynamic placement like workloads
      2. Minizinc models are leverage the optimizer of your choice with the flexibility of multiple solution options – https://github.com/onap/optf-osdf/tree/master/examples/placement-models-minizinc

Other Requirements

...

...

Requirements Needing Operator Feedback

Need for multi (install )NearLong
RequirementOperator/Near-term vs Long-term

Multi-tenant infrastructure management

- Install relevant K8S clusters

if they are not already present

AT&T

- near-term

Bell Canada

- long-term

Requirement

2.

Support for non-K8S based workload deployment


AT&T

Near

- near-term

Bell Canada

Long

- long-term


Architectural Options:

Discussion Kick off:

...