Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Requirements Needing Operator Feedback

Background:

  • The scope here is only for Management Components
  • The same principles apply for Central and Edge Management Components


Requirement

Operator

/

Near-term (2019) vs Long-term (Beyond 2019)

1.Consolidated view of deployed management component micro-services (in Central and other locations such as Edge) and their relationship for central Orchestrator

AT&T - near-term

Verizon- near-term

Dynamic configuration management integrated

2.For a given application configuration management mechanism is the same independent of location (Central and Edge), including dynamic configuration support

AT&T - near-term

Verizon- long-term

3. In relation to No. 2, retain the capability to integrate with Central ONAP Policy and DMaap BusController (for secure topic/feed)AT&T - near-term

Verizon- long-term

Support on Tosca based ONAP management application and workflow for central Orchestrator

4.Retain the ability to support TOSCA artifacts distributed from SDC and CLAMP.

AT&T - near-term

Verizon - long-term

5.Design flow integration (SDC, DCAE-DS) and Standardized configuration modelling support by Central Orchestrator

AT&T - near-term

Verizon - near-term

6.Dynamic Control Loop flow deployment and support through CLAMP/Policy Integration by Central Orchestrator

AT&T - near-term

Verizon - long-term

7.Multi-tenant infrastructure management - Install relevant K8S clusters if they are not already present

AT&T - near-term

Bell Canada - long-term

Verizon - near-term

8.Support for non-K8S based workload deployment


AT&T - near-term

Bell Canada - long-term

Verizon - near-term


Architectural Options:

Discussion Kick off:

...