Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Project NameEnter the name of the project
Target Release NameAmsterdam
Project Lifecycle StateIncubation
Participating Company List the company participating in this release. At least 3-4 organizations, including an operator are recommended.Huawei, AT&T, China Mobile, China Telcom, Orange, VMware, Wind River, Amdocs, ZTE, TechMahindra

Scope

What is this release trying to address?

Describe the problem being solved by this release

Use Cases

Integration is responsible for ONAP cross-project system integration, CI/CD, and all related end-to-end release use cases testing with VNFs necessary for the successful delivery and industry adaption of the ONAP project as a whole.

Use Cases

Integration will support both vCPE and VoLTE use casesDescribe the use case this release is targeted for (better if reference to customer use case).

Minimum Viable Product

Describe the MVP for this release.

...

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox integration and issuetype in (epic)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox and issuetype in (story)
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyINT-7

Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

...