Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

 

  1. Action point follow-up
  2. Admin
    1. testsuite 1.6.2 ready => need merge to produce in nexus and submit patch in OOM
    2. all integration branches will be cut on Friday, once cut any Frankfurt related change must be done in Master first then cherry picked to Frankfurt
    3. Requests for pythonsdk-tests repository approved by TSC, request sent to LF IT, should be available this week
  3. Frankfurt
    1. Windriver lab issues
      1. SB00 reinstalled several times over the last 2 weeks (humane wrong errors)
        1. => show that operation domain is really poor today, high risk to break everything..
        2. shall we invite Stephen Gooch to discuss of Guilin?
          1. big cleaning probably needed..
          2. CI ysing gitlab runner not possible due to the slowliness of the openstack python SDK
      2. Long duration test executed (thanks to Brian Freeman : Frankfurt Stability Run Notes
        1. we cannot do better today
        2. instability on SB00 shows that the stability is relative
        3. Note Openlab (Orange) RC0 version installed since 27 days, basic_vm and clearwater_ims run everyday, still successful today (as well as all the healthcheck tests)..
    2. Use Case status
      1. wiki page follow-up: 2: Frankfurt Release Integration Testing Status
      2. UC indicator > 90% - 2 official remaining use cases
        1. 5G - PNF Pre-Onboarding & Onboarding => vnfsdk 1.5.2 image needed
        2. BBS => possible workaround
        3. It would be good to retest the use cases on RC2
    3. RC2
      1. integration shall give the green light when all the dockers are ready => tracked by RC2 table Frankfurt Readiness dashboard
      2. all the readiness JIRA must be closed prior to any RC2
      3. mail on missing doc lib transferred to TSC/PTL, update needed (PNF preload)
    4. Open issues
      1. Review 1: Frankfurt Release Integration Test Blocking Issues
    5. CI status
      1. New tests introduced in CI
        1. hvves
        2. 5gbulkpm => last test fail but is usually OK when rerun..timeout has been extended from 1 to 5 minutes..
        3. vCPE Tosca in stand-by: possible to reproduce without log error but final status is FAIL => support requested to vCEP Tosca team
      2. regression on 1 security test (public http end point) probably triggered by the integration of hv-ves in CI => WIP
      3. smoke tests
        1. some regression on pnf-registrate (which used to be relatively stable)
          1. mainly due to DCAE instability on Master (500 on dcae healthcheck)
    6. Documentation update
      1. new review needed (ref 1.6.2 version)
  4. Guilin
    1. requirements: the deadline is for today: Guilin release - non-functional requirements proposed list
      1. I added 2
        1. Enhancement of the healthcheck tests from the project
        2. GUI tests from projects dealing with GUI
      2. shall e add additional things for Guilin from integration perspective?
        1. problem of resources for the usecases (to avoid breaking labs)? => 30 use cases = 30 labs? = lots of resources...
        2. shall we put in place a weekly CI to get long duration test during the all release lifecycle..
    2. Master branch
      1. regression detected after the 21-25 European break => revert AAF patch => better result after revert
      2. currently lots of gating with DCAE HC FAIl (500) triggering errors on several smoke tests
  5. AoB

View file
nameMoM_27052020.txt
height150

 

  1. Action point follow-up
  2. Admin
    1. timing for branching? (oparent and csit have already their frankfurt branch)
    2. timing for testsuite 1.6.2?
  3. Frankfurt
    1. Use Case status
      1. wiki page follow-up: 2: Frankfurt Release Integration Testing Status
      2. 70 % < UC indicator < 80%, with last date for completion indicated at the 22nd of May
      3. scale-out test OK congratulations to Yuriy Malakov Marco Platania and Brian Freeman
      4. long duration/stability test
    2. Open issues
      1. Review 1: Frankfurt Release Integration Test Blocking Issues
    3. CI status
      1. All security tests expected for frankfurt now OK (ESR fixed in Master, cherry picked in Frankfurt) https://gating-results.onap.eu/results/onap_daily_pod4_master-556761102-05-18-2020_09-05/
      2. smoke tests
        1. 5gbulkpm: integration in gate
        2. hv-ves (manual test OK), integration in xtesting docker + in CI in progress
        3. vCPE_tosca (use CLI) still work in progress
    4. Documentation update
      1. Update needed: descoped use cases
      2. shall we plan a us case x-review?
  4. Guilin
    1. review of the priorities listed for Guilin: Integration Priorities for Guilin
  5. AoB

...