Test Case Summary
Test Case Number | Test Case | Status |
---|---|---|
1 |
Test Plan
The Transport Slicing integration tests consist of eight (8) test cases. Each test case is broken down into a sequence of measurable checkpoints. These checkpoints are RESTful APIs, each of which has a specific set of input and output parameters that can be measured against. The checkpoints are illustrated below.
Test Case Details
The test procedures for the test cases are provided in the following table.
...
- provide sample Cloud Leased Line Service Intent RESTful API json
...
1. Provide sample ACTN MPI json (input/output)
2. Test PNC simulator against sample
3. Test SDNC against sample
4. Check whether PNC is called to subscribe the user to receive performance monitoring events.
5. Check whether SDNC calls PNC to receive notification events via an SSE connection.
6. Check whether SDNC sends an "unsubscribe" request to PNC upon successful deletion of all CLL instances in a given cloud.
Smart Intent Guarantee based on Closed-loop for CCVPN usecase | PASSED |
Test Case Details
Precondition: the user has already established a CLL link
Test steps:
- The user queries the established CLL link instance in UUI and modifies the maximum bandwidth value of the link
- After Step 1, the link instance status will be shown as “processing” on the link instance information interface; then refresh the website after a while, and the link instance status will be shown as “processed”.
- After Step 2, check the link instance monitoring interface, the maximum bandwidth value will be changed according to the user’s modification
...
- Check whether SDNC calls DCAE upon receiving a performance monitoring notification event
...
- .