Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Test Case Summary

Test Case NumberTest CaseStatus
1
Physical network discovery2Create and delete single CLL instance which accesses single cloud, and monitor if the closed-loop call flow is getting triggered.3Create and delete single CLL instance which access multiple clouds, and monitor if the closed-loop call flow is getting triggered.4Create and delete multiple CLL instances which access single cloud, and monitor if the closed-loop call flow is getting triggered.5Create and delete multiple CLL instances which access multiple clouds, and monitor if the closed-loop call flow is getting triggered.6Create a CLL instance which have connection links with different bandwidth, and monitor if the closed-loop call flow is getting triggered.7Modify the bandwidth of a connection link of an existing CLL instance, and monitor if the closed-loop call flow is getting triggered.8Modify an existing CLL instance by add a new connection link, and monitor if the closed-loop call flow is getting triggered.

Test Plan

The Transport Slicing integration tests consist of eight (8) test cases.  Each test case is broken down into a sequence of measurable checkpoints. These checkpoints are RESTful APIs, each of which has a specific set of input and output parameters that can be measured against.  The checkpoints are illustrated below.

Image RemovedImage Removed

Test Case Details

The test procedures for the test cases are provided in the following table.

...

  1. provide sample Cloud Leased Line Service Intent RESTful API json

...

1. Provide sample ACTN MPI json (input/output)
2. Test PNC simulator against sample
3. Test SDNC against sample

4. Check whether PNC is called to subscribe the user to receive performance monitoring events.

5. Check whether SDNC calls PNC to receive notification events via an SSE connection.

6. Check whether SDNC sends an "unsubscribe" request to PNC upon successful deletion of all CLL instances in a given cloud.

Smart Intent Guarantee based on Closed-loop for CCVPN usecasePASSED

Test Case Details

Precondition: the user has already established a CLL link

Test steps:

  1. The user queries the established CLL link instance in UUI and modifies the maximum bandwidth value of the link
  2. After Step 1, the link instance status will be shown as “processing” on the link instance information interface; then refresh the website after a while, and the link instance status will be shown as “processed”.
  3. After Step 2, check the link instance monitoring interface, the maximum bandwidth value will be changed according to the user’s modification

...

  1. Check whether SDNC calls DCAE upon receiving a performance monitoring notification event

...

  1. .