Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

DRAFT PROPOSAL FOR COMMENTS

The content of this template is expected to be fill out for M1 Release Planning Milestone.

Info
titleInfo

Use the "Copy" and "Move" options (available under the ..., top right of this page) to duplicate this template into your project wiki.
Use the Wiki to document the release plan. Don't provide PowerPoint.
Use as much diagrams and flow charts as you need, directly in the wiki, to convey your message.

Table of Contents
outlinetrue

Overview

Project NameEnter the name of the projectData movement as a platform
Target Release NameEnter the name of the release you are targeting to deliverBeijing  Release
Project Lifecycle StateEither Incubation , Core, Mature. (Refer to ONAP Charter, section 3.3 Project Lifecycle for further information)
Participating Company List the company participating in this release. At least 3-4 organizations, including an operator are recommended.AT&T, Tech Mahindra

Scope

What is this release trying to address?

Describe the problem being solved by this releaseAAF integration with Message Router, Data Router, and Bus Controller will be added to the DMaap and some enhancements to the DMaap client.

Use Cases

Describe the use case this release is targeted for (better if reference to customer use case)The existing Amsterdam use cases are still going to be supported and additional use cases related to DR and Bus Controller  will be supported for the Beijing Release.

Minimum Viable Product

Describe the MVP for this releaseFor Beijing release, the minimum viable product we are targeting is  integrating AAF  with the Message Router, sending and receiving messages using Data router, and provisioning topics and feeds via Bus Controller.

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

Epics

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox DMAAP and issuetype in (epic)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

Stories

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox =DMAAP and status = "To Do" and issuetype in (story)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

Longer term roadmap

Indicate at a high level the longer term roadmap. This is to put things into the big perspective.

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note...) of this release.

...

DMaaP is a premier platform for high performing and cost effective data movement services that transports and processes data from any source to any target with the format, quality, security, and concurrency required to serve the business and customer needs.

Release Deliverables


Deliverable NameDeliverable Description

AAF integration with Data Router

DMaap Git repository
Data Router source codeDMaap Git repository
Data Router libraryONAP Nexus repository
Data Router API descriptionONAP wiki
Data Router Release NotesONAP wiki
Data Router DocumentationDMaap Git repository
Bus Controller APIDMaaP Git repo
Bus Controller ContainerONAP Nexus repo
Bus Controller source codeDMaaP Git repo

Sub-Components

As part of the Beijing release, the following components will be added to DMaaP:

  • Data Router - for file transport
  • Bus Controller Provisioning API - for provisioning of topics (MR), feeds (DR) and permissions (AAF)
  • Bus Controller GUI - human interface to Bus Controller Provisioning API

Architecture

High level architecture diagram

Sub-Components

List all sub-components part of this release.
Activities related to sub-components must be in sync with the overall release.

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

Architecture

High level architecture diagram

At that stage within the Release, the team is expected to provide more Architecture details describing how the functional modules are interacting.

Indicate where your project fit within the ONAP Archiecture diagram.

Block and sequence diagrams showing relation within the project as well as relation with external components are expected.

Anyone reading this section should have a good understanding of all the interacting modules.Image Added

Platform Maturity

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance01Baseline performance criteria will be defined
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability1172 hours soak test with random transactions
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency22K8S auto detection and recovery
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security01
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11Level 1 single site horizontal scaling
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability11Using EELF common framework for logging
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability12API documentation and swagger API provided
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation


  • API Incoming Dependencies

List the API this project is expecting from other projects.
Prior to Release Planning review, Team Leads must agreed on the date by which the API will be fully defined. The API Delivery date must not be later than the release API Freeze date.

...

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
AAFAuthentication and Authorization FrameworkTBDMarch 08 2010TBDTo fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • API Outgoing Dependencies

API this project is delivering to other projects.

API NameAPI DescriptionAPI Definition DateAPI Delivery dateAPI Definition link (i.e.swagger)
To fill outHigh level description of the APIDate for which the API is reviewed and agreedTo fill outLink toward the detailed API description
  • Third Party Products Dependencies

Third Party Products mean products that are mandatory to provide services for your components. Development of new functionality in third party product may or not be expected.
List the Third Party Products (OpenStack, ODL, RabbitMQ, ElasticSearch,Crystal Reports, ...).

...

PublishingAPI used to post a message to the TopicSept 11 2017March 08 2018DMaap API
SubscribingAPI used to subscribe a message from the TopicSept 11 2017March 08 2018DMaap API
ProvisiningAPI for creating,deleting and listing the administrative objectsSept 11 2017March 08 2018DMaap API (Bus Controller API)
Admin APIAPI for the admin accessSept 11 2017March 08 2018DMaap API
  • Third Party Products Dependencies

NameDescriptionVersion
AJSCJava services container1.0.0
KafkaDistributed messaging platform0.8.2.1
Zoo KeeperCentralized service for maintaining configuration information3.4.6
SpringSpring Framework1.4
DockerContainer engine1.12
  • Testing and Integration Plans

  1. Unit test: Unit tests has atleast 30% code coverage.
  2. Functional test: Leverage the robot framework infrastructure to provide the functional test.
  3. Integration test: Support integration team to provide the end to end integration test.
  4. All the above should be automation tests run on the LF Jenkins Infrastructure.


  • Gaps

No gaps identified so far

In case there are specific dependencies  (Centos 7 vs Ubuntu 16. Etc.) list them as well.

  • Testing and Integration Plans

Provide a description of the testing activities (unit test, functional test, automation,...) that will be performed by the team within the scope of this release.

Describe the plan to integrate and test the release deliverables within the overall ONAP system.
Confirm that resources have been allocated to perform such activities.

  • Gaps

This section is used to document a limitation on a functionality or platform support. We are currently aware of this limitation and it will be delivered in a future Release.
List identified release gaps (if any), and its impact.

...

  • Known Defects and Issues

Provide a link toward the list of all known project bugs.

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=sanbox DMaap and issuetype in (bug)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

  • Risks

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

...

No known risks so far.

  • Resources

Updated  

  • Resources

Fill out the Resources Committed to the Release centralized page .

  • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

  • Team Internal Milestone

  • This section

...

  • may be used to document internal milestones

...

  • that the team agreed on.

    Also, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone,

...

  • provide these agreements and dates in this section.

    It is not expected to have a detailed project plan.

    Date

    Project

    Deliverable

...

  • 3/29/2018DMaaPDMaap - Buscontroller

...

  • Documentation, Training

  • Highlight the team contributions to the specific document related to he project (Config guide, installation guide...).
  • Highlight the team contributions to the overall Release Documentation and training asset
  • High level list of documentation, training and tutorials necessary to understand the release capabilities, configuration and operation.
  • Documentation includes items such as:
    • Installation instructions
    • Configuration instructions
    • Developer guide
    • End User guide
    • Admin guide
    • ...

...

titleNote

...

Other Information

  • Vendor Neutral

If this project is coming from an existing proprietary codebase, ensure that all proprietary trademarks, logos, product names, etc. have been removed. All ONAP deliverables must comply with this rule and be agnostic of any proprietary symbols.

  • Free and Open Source Software

FOSS activities are critical to the delivery of the whole ONAP initiative. The information may not be fully available at Release Planning, however to avoid late refactoring, it is critical to accomplish this task as early as possible.
List all third party Free and Open Source Software used within the release and provide License type (BSD, MIT, Apache, GNU GPL,... ).
In the case non Apache License are found inform immediately the TSC and the Release Manager and document your reasoning on why you believe we can use a non Apache version 2 license.

...