AreaActual levelTargeted level for current releaseHow, EvidencesComments
Performance0

0

(given CLAMP is design time there is no point to adhere to L2 requirement) 

Run performance basic test, depends on performance criteria availability for level 1 - not able to commit to more than what was done on Beijing
  • Level 0: no performance testing done
  • Level 1: baseline performance criteria identified and measured  (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
  • Level 2: performance improvement plan created 
  • Level 3: performance improvement plan implemented for 1 release (improvement measured for equivalent functionality & equivalent hardware)

minimum level for Dublin is 0 except for Control Loop projects. 


see Performance levels

Stability112

Participate to Stability runs Level 1

Jira
columns
serverONAP JIRAkey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCLAMP-100276


Integration Team is responsible to run the platform test to prove level 2.

  • Level 0: none beyond release requirements
  • Level 1: 72 hour component-level soak test (random test transactions with 80% code coverage; steady load)
  • Level 2: 72 hour platform-level soak test (random test transactions with 80% code coverage; steady load)
  • Level 3: track record over 6 months of reduced defect rate

minimum level for Dublin:2 

see Stability levels

Resiliency1

1

(given CLAMP is design time there is no point to adhere to L2 requirement) 

Jira
serverONAP JIRA
serverId425b2b0a-557c-3c0c-b515-579789cceedb
keyCLAMP-83

  • Level 0: no redundancy
  • Level 1: support manual failure detection & rerouting or recovery within a single site; tested to complete in 30 minutes
  • Level 2: support automated failure detection & rerouting 
    • within a single geographic site
    • stateless components: establish baseline measure of failed requests for a component failure within a site 
    • stateful components: establish baseline of data loss for a component failure within a site
  • Level 3: support automated failover detection & rerouting 

    • across multiple sites 

    • stateless components 

      • improve on # of failed requests for component failure within a site 

      • establish baseline for failed requests for site failure 

    • stateful components 

      • improve on data loss metrics for component failure within a site 

      • establish baseline for data loss for site failure


Minimum Levels (Dublin)

  • Runtime Projects: Level 2 (stretch goal Level 3)
    • NOTE: For Dublin, the building blocks will be put in place for Level 3 geo-redundancy, and a few projects will pilot it
  • All other Projects: Level 1 (stretch goal Level 2)

see Resiliency Levels 

 

Security11
  • Reach CII passing badge, increasing test coverage as remaining item
  • AAF CADI integration
  • Infrastructure setup for js test coverage

    same as in Casablanca, not enough resource to allocate to this effort.



    see Security Levels

    Scalability11

    Level 1 single site horizontal scaling

    Jira
    serverONAP JIRA
    serverId425b2b0a-557c-3c0c-b515-579789cceedb
    keyCLAMP-102

    • Level 0: no ability to scale
    • Level 1: supports single site horizontal scale out and scale in, independent of other components
    • Level 2: supports geographic scaling, independent of other components
    • Level 3: support scaling (interoperability) across multiple ONAP instances

    Minimum Levels (Dublin)

    • Runtime Projects: Level 1 
      • NOTE: For Dublin, the building blocks will be put in place for Level 2 geographic scaling, and a few projects will pilot it
    • All other Projects: Level 0 

    see Scalability levels 

    Manageability1

    1

    (2, if CLAMP can get more resource from the community)


    • Level 1:
      • All ONAP components will use a single logging system.
      • Instantiation of a simple ONAP system should be accomplished in <1 hour with a minimal footprint
    • Level 2:
      • A component can be independently upgraded without impacting operation interacting components
      • Component configuration to be externalized in a common fashion across ONAP projects
      • All application logging to adhere to ONAP Application Logging Specification v1.2
      • Implement guidelines for a minimal container footprint
    • Level 3
      • Transaction tracing across components

    Minimum Levels (Dublin)

    • All Projects: Level 2
      • New projects should adhere to v1.2
      • Existing projects have stretch goal for v1.2
    • Stretch Goal: Level 3 
    • Note: some work will be done in Dublin to test/prep for a release upgrade strategy

    see Manageability Levels 

    Usability1

    1

    (2, if CLAMP can get more resource from the community)

    CLAMP is not anticipating new API at this point, so we are technically compliant with API CVS at this point

    • Level 1:

        • User guide created
        • Deployment documentation
        • API documentation
        • Adherence to coding guidelines
    • Level 2:
    • Level 3
        • Consistent UI across ONAP projects
        • Usability testing conducted
        • API Documentation
    • Level 4

      Minimum Levels (Dublin)

      • All Projects: Level 2
      • Stretch Goal: External APIs also follow the Versioning Strategy


    • see Usability Levels

    ...

    Risk identifiedMitigation PlanContingency Plan
    new policy api(and contents) for CRUD operations on policies not defined yet use old policy API

    create config. policy the old("R3 release") way

    blueprint generated by DCAE-D (SDC) might not be compatible with DCAEkeep current manual blueprint onboarding in SDC (as VFI).manually created blueprint with correct format manually on boarded in SDC and distributed to CLAMP and DCAE. 
    new DCAE API to get status of µS not yet defined   use current DCAE api monitor only µS created by CLAMP 

    Resources