Test Case Summary
Test Case Number | Test Case | Status |
---|---|---|
1 |
Test Plan
Test Case Details
The test procedures for the test cases are provided in the following table.
...
Smart Intent Guarantee based on Closed-loop for CCVPN usecase | PASSED |
Test Case Details
Precondition: the user has already established a CLL link
Test steps:
- The user queries the established CLL link instance in UUI and modifies the maximum bandwidth value of the link
- After Step 1, the link instance status will be shown as “processing” on the link instance information interface; then refresh the website after a while, and the link instance status will be shown as “processed”.
- After Step 2, check the link instance monitoring interface, the maximum bandwidth value will be changed according to the user’s modification.
...