Test Case Summary

Test Case NumberTest CaseStatus
1
2345678

Test Plan

Test Case Details

The test procedures for the test cases are provided in the following table.

...

Smart Intent Guarantee based on Closed-loop for CCVPN usecasePASSED

Test Case Details

Precondition: the user has already established a CLL link

Test steps:

  1. The user queries the established CLL link instance in UUI and modifies the maximum bandwidth value of the link
  2. After Step 1, the link instance status will be shown as “processing” on the link instance information interface; then refresh the website after a while, and the link instance status will be shown as “processed”.
  3. After Step 2, check the link instance monitoring interface, the maximum bandwidth value will be changed according to the user’s modification.

...