Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Project NameEnter the name of the project
Target Release NameGuilin
Project Lifecycle StateCore
Participating Company AT&T, Samsung, IBM

Scope

What is this release trying to address?

Security enhancements and technology stack upgrade. More details tracked here Requirements for Frankfurt - road map

Guilin Impact View per Component

Requirements

Specific new Usecases - N/A. Supports all existing ONAp ONAP usecase as per earlier releases.Requirements for Frankfurt - road map

Guilin Impact View per Component

Minimum Viable Product

Enhanced SecurityRich user experience through latest Angular upgrade and improved performance through Springboot upgrade.

Analytics Framework (aka Raptor) Upgrade to supports reports, charts etc

Functionalities

List the functionalities that this release is committing to deliver by providing a link to JIRA Epics and Stories. In the JIRA Priority field, specify the priority (either High, Medium, Low). The priority will be used in case de-scoping is required. Don't assign High priority to all functionalities.

...

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=PORTAL and issuetype in (story) and fixversion='Frankfurt Guilin Release'
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

Indicate at a high level the longer term roadmaproad map. This is to put things into the big perspective.

Requirements for Frankfurt Guilin - road map

Release Deliverables

Indicate the outcome (Executable, Source Code, Library, API description, Tool, Documentation, Release Note, etc) of this release.

...

Sub-components are repositories and are consolidated in a single centralized place. Edit the Release Components name for your project in the centralized page.

...

Refering to CII Badging Security Program and Platform Maturity Requirements, fill out the table below by indicating the actual level , the targeted level for the current release and the evidences on how you plan to achieve the targeted level.

Project Maturity Review for ONAP Portal

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance22
  • 0 -- none
  • 1 – baseline performance criteria identified and measured
  • 2 & 3 – performance improvement plans created & implemented
Stability22
  • 0 – none
  • 1 – 72 hours component level soak w/random transactions
  • 2 – 72 hours platform level soak w/random transactions
  • 3 – 6 months track record of reduced defect rate
Resiliency22
  • 0 – none
  • 1 – manual failure and recovery (< 30 minutes)
  • 2 – automated detection and recovery (single site)
  • 3 – automated detection and recovery (geo redundancy)
Security22
  • 0 – none
  • 1 – CII Passing badge + 50% Test Coverage
  • 2 – CII Silver badge; internal communication encrypted; role-based access control and authorization for all calls
  • 3 – CII Gold
Scalability11
  • 0 – no ability to scale
  • 1 – single site horizontal scaling
  • 2 – geographic scaling
  • 3 – scaling across multiple ONAP instances
Manageability22
  • 1 – single logging system across components; instantiation in < 1 hour
  • 2 – ability to upgrade a single component; tracing across components; externalized configuration management
Usability22
  • 1 – user guide; deployment documentation; API documentation
  • 2 – UI consistency; usability testing; tutorial documentation

...

Jira
serverONAP JIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject=portal and issuetype in (bug) and fixversion='Guilin release' AND project=portal and issuetype in (bug) and fixversion='Guilin release' AND status in (Open, "In Progress", Submitted, Delivered)
serverId425b2b0a-557c-3c0c-b515-579789cceedb

...

List the risks identified for this release along with the plan to prevent the risk to occur (mitigation) and the plan of action in the case the risk would materialized (contingency).

Guilin Risks

Risk identifiedMitigation PlanContingency Plan
To fill outTo fill outTo fill out
  • Resources

Fill out the Resources Committed to the Release centralized page.

  • Release Milestone

...

This section is optional and may be used to document internal milestones within a project team or multiple project teams. For instance, in the case the team has made agreement with other team to deliver some artifacts on a certain date that are not in the release milestone, it is erecommended recommended to provide these agreements and dates in this section.

...