Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  1. Architecture Doc update for the Frankfurt Release
    1. Need volunteers to update/review some section of the Architecture Document for the Frankfurt Release
  2. Jira REQ-# added to the tracking spreadsheet per requirement topic
    1. Guilin-R7 tracking spreadsheet has already been updated
  3. how to  close out "Conditionally approved" Reviews
      Requesting moving Topic 3 to be the first Topic on the agenda
      1. Send an email to onap-arc  mailing list confirming that all the open issues have been dissuaded/agreed on by the impacted area leads - Required
      2. schedule a follow-up review with ArchCom - Optional
      3. Update the ArchhCom Tracking Jira with all the links to the referenced materials - Required
    1. ONAPARC-# will be added to the issue link for the corresponding Requirement topic REQ-#
      1. See item 2 above
    2. ONAPDOCS update
      1. The Architecture View has been updated to reference to the Frankfurt RTD pages
    3. An updated Tracking spreadsheet is attached
      1. Added a separate wiki page to list the latest version, per section 5 below.

    1- Guilin -R7 Architecture Reviews and Meeting Minutes


    • Topic 1: Guilin-R7  AR-

    ...

    • 0020-R7-052020 - ONAP RelG

    ...

    ...

    • Topic 5Guilin-R7 (AR-0036-R7-052020)

    ...

    2-General Architecture Items

    ...

    5 - Current Release Arch Review Tracking

    ONAP-arch-reviews- tracking-r7-09-Jun-2020.xlsxGuilin-R7 ArchCom Reviews Tracking spreadsheet


    Meeting Minutes and Referenced Materials

    ...