Comment: Added DL POC link

...

Project NameEnter the name of the project
Target Release NameDublin
Project Lifecycle StateIncubation. Refer to ONAP Charter, section 3.3 Project Lifecycle for further information
Participating Company AT&T, Nokia, Ericsson, Tech Mahindra, Wipro, Huawei, Cisco, ChinaMobile

Scope

What is this release trying to address?

...

   Note:  Work on STRETCH GOAL will progress through R4 however they cannot be committed yet for delivery (due to resource constraint /external dependencies /unclear requirement). These will be evaluated around M3 and will be either committed or deferred.


(Added - 02/18/19) - Datalake as POC was approved by TSC. DCAE support for DL project is being tracked under this link  - DataLake POC


Use Cases

DCAE will provide support for the following use cases,

...

      • Performance:  Level 1
      • Stability: Level 1+ (80% coverage cannot be met2 (stetch with new ~52% coverage requirement for Dublin)
      • Resiliency: Level 2
      • Security: Level 1+
      • Scalability: Level 1
      • Manageability: Level 1+
      • Usability: Level 2                   

...

Sub-components are repositories and are consolidated in a single centralized place. Edit the Resouce and Repositories in the centralized page.

...

AreaActual LevelTargeted Level for current ReleaseHow, EvidencesComments
Performance11+  (Dublin recommendation 2 - cannot be committed due to Resource constraint)
    • Level 0: no performance testing done
    • Level 1: baseline performance criteria identified and measured  (such as response time, transaction/message rate, latency, footprint, etc. to be defined on per component)
    • Level 2: performance improvement plan created 
    • Level 3: performance improvement plan implemented for 1 release (improvement measured for equivalent functionality & equivalent hardware)
Stability2

Level 1 - Project team (may not reach 80% code coverageLevel 2 (Stetch with new ~52% coverage requirement for Dublin)

Level 2  - Dependent on integration team support



    • Level 0: none beyond release requirements
    • Level 1: 72 hour component-level soak test (random test transactions with 80% code coverage; steady load)
    • Level 2: 72 hour platform-level soak test (random test transactions with 80% code coverage; steady load)
    • Level 3: track record over 6 months of reduced defect rate
Resiliency22
    • 0 – none
    • 1 – manual failure and recovery (< 30 minutes)
    • 2 – automated detection and recovery (single site)
    • 3 – automated detection and recovery (geo redundancy)
Security1

1+ (Dublin recommendation 2 - cannot be committed for following reason)

  • Resource constraint
  • CADI library not available for Python 
  • Process of AAF certificate distribution in K8S between ONAP components and external (xNF) to be defined

    DCAE team will integrate with Buscontroller integration for dynamic topic provisioning and AAF based role setting as STRETCH GOAL



    • Level 0: None
    • Level 1: CII Passing badge
      • Including no critical and high known vulnerabilities > 60 days old
    • Level 2: CII Silver badge, plus:
      • All internal/external system communications shall be able to be encrypted.
      • All internal/external service calls shall have common role-based access control and authorization using CADI framework.
    • Level 3: CII Gold badge 
Scalability1

1



    • Level 0: no ability to scale
    • Level 1: supports single site horizontal scale out and scale in, independent of other components
    • Level 2: supports geographic scaling, independent of other components
    • Level 3: support scaling (interoperability) across multiple ONAP instances
Manageability1

1+ (Dublin recommendation 2 - cannot be committed for following reason)

  • Resource constraint to support #2 and #4 under Level2
    (Level 2 - #1 and #3 will be targeted for Dublin)



    • Level 1:
    • All ONAP components will use a single logging system.
    • Instantiation of a simple ONAP system should be accomplished in <1 hour with a minimal footprint
    • Level 2:
      • A component can be independently upgraded without impacting operation interacting components
      • Component configuration to be externalized in a common fashion across ONAP projects
      • All application logging to adhere to ONAP Application Logging Specification v1.2
      • Implement guidelines for a minimal container footprint
    • Level 3
      • Transaction tracing across components
Usability1

2 (STRETCH GOAL- based on resource availability)



    • Level 1:
      • User guide created
      • Deployment documentation
      • API documentation
      • Adherence to coding guidelines
    • Level 2:
    • Level 3
      • Consistent UI across ONAP projects
      • Usability testing conducted
      • API Documentation
    • Level 4

...

Risk identifiedMitigation PlanContingency Plan

To fill outTo fill out
    • Resources

Fill out the Resources Committed to the Release centralized page.

    • Release Milestone

The milestones are defined at the Release Level and all the supporting project agreed to comply with these dates.

...