Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

...

TopicDiscussion

R6 / R7

ReadtheDocs

Read the Docs

  •  ACTION: Update ReadtheDocs https://git.onap.org/integration/tree/docs - Jira under Integration - invite team for review - invite PTL (Morgan R.) -Gerrit PTL submission +1 from reviewers. committer/Morgan +2 (someone in Integration project will do the Merge)
  •  New project → Repo → DOC directory (RST) in that Repo Andreas Geissler  → Signoff for R6 May 2020; M0 for R7. If we are approved by TSC as a new project → create a new Repo

R7 TSC /

Project Proposal

Configuration Persistency Persistence Service Project Proposal (Oct 25 2019)

  •  ACTION: PERFORMANCE - Open (#@#) open items to get ballpark figures for # API requests.
  •  ACTION: LIFECYCLE - find out the Lifecycle State "enumerations" - is "incubation" right?
  •  ACTION: TSC Step #2 - Ben sent the TSC asking for slot. TSC. M4. RC0 bumped by a week. Q1 Who will be contributors. Joanne → Catherine.
  •  ACTION: Virtual Meeting - What is our deadline? April 21-23. Subcommittee meeting (LA USA). planning virtual plannig / presentations. M0 wiki: https://wiki.lfnetworking.org/display/LN/2020+April+Virtual+Technical+Event
  •  ACTION: Peer Review Process Step #1 - ONAP Projects ... Ready for PEER REVIEW? What is involved in that? What's the process? submit to the TSC? Ask Kenny what is PEER REVIEW? Presentation to ARCH S/C
  •  ACTION: ID PTL/Contributors - who will be contributors, who wants to be the PTL. Resources & Committers from Ericsson (Tony Finnerty), AT&T, IBM (Sandeep) commitment in R7.
  •  Race Condition Simultaneous requests to update the same info - Config Controller Persona / writers update / APPC VFC SDNC / EMS does update / New yang model will change, SDNR change in network SDNR does go device gets new Yang model puts into the Database. incremental Yang model / PNF package yang model → schema (1 time activity) DB configuration - when you get a config change notification you get all the information you need parameter:newvalue. / who is the MASTER of the data? the mediator / Mirror data - Use Case / the owner controller-persona to update / database update writer

R7 Guilin

Content / requirements

Requests for R7 Requirements are up.

Guilin release - functional requirements proposed list

Timeline -  Sign-off for R6 is May 7. Historically M0 kickoff for R7 is May 7th

PROPOSALS FOR R7 GUILIN FOR WHAT WE PLAN TO BE DOING IN R7:

  1. R7 Project Proposal (identify PTL, Project proposal, setup repo)
  2. =STEP 0= (Design time), (Setup DB) Yang Model development ORAN specification Yang Model in line with 3GPP. SQL structure.
  3. =STEP 0= Schema design/setup & API
  4. =STEP 1= CMnotify generated by RanSIM extended (final standard format).
  5. =STEP 1= VES generation, Nokia Simulate DU → simulate VES CMNotify message.
  6. =STEP 1-6= CMNotify (Nokia) Integration Step 2,3,4 with SON work Step 1,5,6
  7. =STEP 5/6= Mapping CMnotify contents into DB
  8. =STEP 5a= New Development for Independent component to get VES off of DMaaP
  9. =STEP 6= API Updates
  10. =STEP 6= Interface to RTCDB (writing DB from SDN-R or RCDB-stand-alone-component)

SUMMARY OF THE STEPS FOR RTCDB "HOW IT OPERATES" (Reference):

  • STEP 0: Design time, Setup DB schema & API (Onboarding).
  • STEP 1: xNF (RAN Simulator) GENERATES a VES CMNotify - Wipro SON (R6 Done)
  • STEP 1a: Simulator of VES CMNotify/"Standardsdefined/CM" (Nokia) (R7)
  • STEP 2: DCAE VES Collector RECEIVES the CMNotify (VES) - Nokia (R7)
  • STEP 3: DCAE PROCESSES VES Event- Nokia (R7)
  • STEP 4: DCAE PUBLISHES onto DMaaP - Nokia (R7)
  • STEP 5: CCSDK (Controller) LISTENS to DMaaP - Sandeep Shah  (R6 Done) → (R7)
  • STEP 5a: RTCDB (stand-alone component) LISTENS to DMaaP (R7 new)
  • STEP 6: RTCfgDB UPDATES DB with info - Sandeep Shah / Techmahindra (R6 Done) → (R7)

A&AI FLOWS:

STEP 1...6: Initial A&AI setup of DB (the setup of the DB with the initial set of all xNFs a "getall")

STEP 1...6: A&AI Update (e.g. a new xNF is added or deleted)


R7 TopicDescription & Links

Usage of CPS -

OOF/SON/PCI (Cell info)

E2E Network Slicing (Slicing info)

Harmonization (Stnd-Def VES)

Virtual F2F mentioned the C&PS project.

Those other use cases have dependency to Use cases.

We need to attend U/C weekly meetings; sync

Guilin (R7) - Use Cases (and Requirements in Use Cases)

Guilin release - functional requirements proposed list

Interaction & Dependencies Use Case

Interaction spreadsheet

Sync between these teams.

Joint meeting - Invitee on a particular in the schedule

TSC Project Proposal

Configuration Persistency Persistence Service Project Proposal (Oct 25 2019)

Project Home Pagesample-landingpage Project Home Page
Project Repository

Create Repo: Resources and Repositories (Deprecated)

Process to create Repo. Ticket

Architecture S/C

Architecture Proposal

ONAP Architecture Review process:Project Architectural Review Requirements and Process (Draft) to M1 Project PTLs/Feature Sponsors request a review by email from the chair of the arch subcommittee. The chair of the arch subcommittee creates a JIRA issue for the review and emails a link to the project PTL. The project PTL/Feature Sponsor adds the JIRA issue link to the architecture review JIRA task in the M1 epic, as confirmation that a review has been requested.

R7 Wiki PageConfiguration & Persistency Service R7


R7 GuiLin Development

CMNotify specification

  •  (Watch for): R6 VES 7.1.1 Baselined https://gerrit.onap.org/r/c/vnfrqts/requirements/+/100876  (VES Event Reg review) and https://gerrit.onap.org/r/c/vnfrqts/requirements/+/100867 (VES Event Listener review)
    R7 VES 7.2 review open new updates to the VES listener should include CM VES event. Participate review.
  •  ACTION: R7 VES Common Header update to align with 3GPP SA5 (CR) Nokia/ ATT/ Orange/ Ericsson. Presentation for Monday 2PM UTC on Alla's Req S/C call. "ONAP-ORAN Harmonization". Vimal, Marge, Cormac, Damian. Domain "Standards-Defined" NameSpace "3GPP-CM-xxxx"

...

SUPPORTING FILES

DescriptionFile

TSC Presentation

View file
nameConfigurationPersistencySvc_10Ap2020v429Ap2020v5.pptx
height250



RECORDING

250
RecordingFile
Zoom

View file
namezoom_0.mp4
height250

Audio Only

View file
nameaudio_only.m4a
height250

Chat
View file
namechat.txt
height

View file
nameplayback.m3u
height250

...