You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

10/6/2017

Closed loop control test is decomposed into the following items:

  1. Design and load policy rules t policy engine. Ideally this should be done by CLAMP. In case of problems, the workaround is to use Policy GUI.
  2. Preload AAI with vCPE data. The purpose is to lookup vServer using vGMUX VNF ID.
  3. vGMUX sends packet loss VES to DCAE VES collector
  4. DCAE TCA sends an event to Policy through DMaaP
  5. Policy process the event from DCAE and sends a “restart” event to APPC through DMaaP
  6. APPC captures the event from Policy, and then restarts the VM
  • No labels