You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Agenda:

  • SOL003 and Stand-alone DB Microservice contribution summarize OOF?5min?.
  • Release calendar?identity important milestone deadline?5min?.
  • VFC connet to OOF (Huang Haibin 30 mins) .
  • Data model bug introduction (Huang Haibin 20mins, postpone to next meeting) .


Attendees:

huanghai bin, hanyanan, Jinhua FU, Liuskyter, maopeng, mingzhang li, ruoyu ying,Shobana,Yan, TR00568434

Recording:


Minutes:

1.SOL003 and Stand-alone DB Microservice contribution summarize OOF

   Identified all subtasks about above two task, zte and verizon will collaborate to contribute these two task.

2.Release calendar?identity important milestone deadline?5min?.

    M3 API freeze(2018/8/23)

    M4 code freeze(2018/9/20)

3. VFC connet to OOF (Huang Haibin 30 mins) .

    Haibin and ruoyu introduce the overall design about how  VFC integrates with OOF. 

    Q: The design only mentioned about gvnfm , need to consider the svnfm scenario

    Q: About two callback proposal, there is no difference for Async and sync, but the callback url should be nslcm

    Q: OOF output and input parameters,  how OOF to know the allocation requiremnets

    The overall design has been known ,but more details need discuss offline


Action:

  1.  The OOF integration details need to be discussed

  2.   If the task haven't started, task owner should start to work right now to catch up the following milestones 
  • No labels