Date:
Participants
Shankaranarayanan Puzhavakath Narayanan
Agenda
- Review of Frankfurt test status
- Overview of e2e requirements for Guilin
Open Action Points from previous meeting
S.No. | Action | Responsible | Status |
---|---|---|---|
20200316_7 | Frankfurt enhancement to be identified this week. | Chuanyu, Swami | Ongoing |
20200323_1 | Documentation to be completed and checked at the end of Integration Test (so this action will be kept open until then): 1. Setup and demo (readthedocs as well as wiki) 2. Design documentation 3. Component/project level document (OOF, SO, UUI) (readthedocs as well as wiki) 4. Flows - e2e flows, and detailed component interactions, including key parameters 5. E2e use case (readthedocs) | Swami, Lin, Chuanyu | Ongoing |
20200323_2 | Consider CSITs/test automation for our use case (once the Integration Test work is nearly complete) (reach out to Integration Team as needed) | Chuanyu, Swami | Open |
20200323_3 | Update the zoom bridge details for the Guilin release requirements meetings for our use case | Lin, Swami | Closed |
20200323_4 | Discuss further reg. the FM/PM data that will be exposed to NSMF (realized in ONAP) (or first level NSSMF), especially when interacting with external NSSMF(s) - this should also be considered in the APIs/interface discussions | Swami, Henry, Shankar | Open |
20200323_5 | Prepare the e2e scope and demo proposed for Guilin, and align the different tracks to this overall scope | Lin, Swami, Chuanyu, Shankar | Ongoing |
Notes and Actions
- The Integration Test status, and the progress w.r.to OOF, UUI, EXT-API and SO were reviewed.
- Lin provided an overview of the Guilin requirements from an e2e perspective, and how various tracks will align. Further details are to be elaborated along with the overall scope, flows and demo proposal.
S.No. | Action | Responsible |
---|---|---|
20200330_1 | Update RC0 scorecard | Lin, Swami |
20200330_2 | Add more details of the Requirements ppt as well as include demo scenarios | Swami, Lin |
20200330_3 | Explore options to use real/simulated NFs (including open source options) | Lin, Swami |
20200330_4 | Clearly highlight the high priority items for Guilin release | Lin, Swami |
20200330_5 | Call out the Frankfurt improvements items also in the requirements ppt explicitly, e.g., the use of models, resource discovery mechanisms | Swami, Chuanyu |
20200330_6 | Prepare the e2e flows | Swami, Chuanyu |
Recording