You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

(In progress)

Category: External System Registration


T00001: WindRiver OpenStack VIM Registration

Test Case IDT00001
Test Case NameWindRiver OpenStack VIM Registration
DescriptionWindRiver OpenStack VIM Registration
ReleaseAmsterdam
Preconditions
  1. The WindRiver OpenStack VIM is configured with tenant information and provider networks
  2. The WindRiver OpenStack VIM services (console, auth, neutron, image, glance, etc) are accessible from ONAP by IP
Testing Steps
  1. Add VIM from ONAP GUI with VIM location information, tenant authentication information
  2. VIM default service url can be configured based on real VIM settings
Expected Results
  1. VIM is registered successfully
  2. Tenant authentication information is stored correctly
Actual Results
Conclusion (Pass/Fail)
Testing Lab
Tester Name



Category: VNF Onboarding and Service Creation


T00002: vCPE VNFs Onboarding

Test Case IDT00002
Test Case NamevCPE VNFs Onboarding
DescriptionOnboard vDHCP, vAAA, vDNS, WebServer, vBRG, vBNG, vGMux, vG
ReleaseAmsterdam
Preconditions
  1. All HEAT and TOSCA templates are ready
  2. VNF license has been created
Testing Steps
  1. Use SDC to import, test and certify the following VNF templates, including both yaml and env files: vDHCP, vAAA, vDNS, WebServer, vBRG, vBNG, vGMux, vG
Expected Results
  1. All VNFs are onboarded successfully
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


T00003: vCPE Service Creation

Test Case IDT00003
Test Case NamevCPE Service Creation
DescriptionThis creates vCPE service
ReleaseAmsterdam
Preconditions
  1. All VNFs have been onboarded
  2. All VNFs images files have been uploaded manually into VIM
Testing Steps
  1. Use SDC to create core infrastructure service including DHCP, AAA, DNS, and Web server
  2. Use SDC to create a service including vBNG
  3. Use SDC to create a service including vGMux
  4. Use SDC to create a service including vBRG
  5. Use SDC to create a service including vG
Expected Results
  1. Each service is created successfully and stored in the catalog
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


T00004: Closed Loop Configuration

Test Case IDT00004
Test Case NameClosed loop configuration
Description

This test will be completed after the CLAMP R1 plan is finalized

ReleaseAmsterdam
Preconditions
Testing Steps
Expected Results
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


Category: Service Instantiation and Monitoring


T00005: Infrastructure Service Instantiation

Test Case IDT00005
Test Case NamevCPE Infrastructure Service Instantiation
DescriptionThis test covers the infrastructure service instantiation process, including DHCP, AAA, DNS, Webserver, vBNG, and vGMux.
ReleaseAmsterdam
Preconditions
  1. vCPE services have been created
  2. Closed loop has been configured
Testing Steps
  1. ONAP user uses VID to instantiate DHCP, AAA, DNS, and Webserver
  2. ONAP user uses VID to instantiate vBNG
  3. ONAP user use Robot to instantiate vGMux
Expected Results
  1. DHCP, AAA, DNS, and Web Server are up and running
  2. vBNG is up and running
  3. vGMux is up and running
  4. The network connection all the above VNFs are created successfully
  5. The closed loop is up and running, DCAE can collect packet loss rate from vGMux and send analytics results to Policy
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


T00006: Customer Service Instantiation

Test Case IDT00006
Test Case NamevCPE Customer Service Instantiation
DescriptionThis test covers the customer service instantiation process, including vBRG emulator and vG and the related configuration.
ReleaseAmsterdam
Preconditions
  1. vCPE services have been created
  2. vCPE infrastructure service has been instantiated
Testing Steps
  1. ONAP user uses VID to instantiate a vBRG and a VM that is connected to the vBRG
  2. Once vBRG is instantiated, its subsequent DHCP request will invoke ONAP to instantiate a vG and complete all required configuration. This step does not require human intervention.
  3. ONAP user sign on to the VM connected to the vBRG and test connection to the web server.
Expected Results
  1. vBRG and vG are up and running
  2. ONAP user can access the web server
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


Category: Closed Loop


T00007: vCPE Auto-healing

Test Case IDT00007
Test Case NamevCPE Auto-healing
DescriptionThis test covers the closed loop to restart vGMux when packet loss is detected.
ReleaseAmsterdam
Preconditions
  1. vCPE service instantiated
  2. Customer service instantiated
  3. Close loop is up and running
Testing Steps
  1. Use Robot to invoke vGMux to generate packet loss event
  2. The event will trigger self-healing, the process is automatic and does not require human intervention
Expected Results
  1. DCAE captures packet loss event and sends event to Policy
  2. Policy invokes APPC to restart the vGMux VM
  3. vGMux VM is restarted
  4. Web server access from customer is disrupted during restarting and restored afterwards
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name


Category: Service Termination


T00008: vCPE Service Termination

Test Case IDT00008
Test Case NamevCPE Service Termination
DescriptionThis test covers vCPE service termination process
ReleaseAmsterdam
Preconditions
  1. vCPE service is created
  2. Closed loop is established
Testing Steps
  1. ONAP user uses Usecase UI GUI to remove vCPE service
Expected Results
  1. Closed loop is stopped
  2. All vCPE VNFs and VLs are removed
  3. DCAE collector container removed and the analytics application unloaded.
  4. Closed loop related artifacts (including DCAE template and policy) are removed from ONAP
Actual Results
Conclusion (Pass/Fail)
Testing LabWindRiver Lab
Testing Date
Tester Name



  • No labels