You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Overview:

INT-1295  E2E integration test consists of three main parts:    

  1. Environment setup for SDNC, validating external certificate if received through AAF Certservice module.
  2. Environment setup for simulated Node, validating certificate if received via AAF Certservice module.
  3. Adding simulated Node in ODL over TLS, Validating if the Node is connected, fectching details.


Enviroment Setup for SDNC is made in which Client Certificate, Client Private Key, CA Certificate is requested form AAF Cert Service Module, After receiving Certifictes those are loaded in SDNC- ODL Key Store.

Similar to SDNC, Netconf-Pnp-Simulator Enviroment Setup is done and Server_key.pem, Server_cert.pem, CA.pem as required by Netconf-Pnp-Simulator are generated and uploaded in Netconf Container.

In third steps Netconf-pnp-Simulator is Connected over TLS to SDNC-ODL and Validation is carried out to find if connection in properly made.


TC ID

Test Case Name

Test Case Description

Expected Result  Test Status
T01


PASS. HTTP/1.1 202

 PASSED

T02


PASS. HTTP/1.1 202

PASSED

T03


PASS. HTTP/1.1 202

PASSED

T04


FAIL, HTTP/1.1 401

PASSED

T05


FAIL, HTTP/1.1 401

PASSED

T06



FAIL, HTTP/1.1 401

PASSED

T07


FAIL , HTTP/1.1 401

PASSED


  • No labels