Attendees:

 Ritusood,maopeng,jinhua,Yan Yang,Lu xin,Shashank, yufei

Agenda:

  1. summarize the M4 status and remaining issues
  2. look through RC0  checklist

Minutes:

First topic

  1. Yan summarized the VF-C M4 status and related issues.
    VF-C M4 is still in progress,because the following issues.

    a. Code coverage       --------- Already reach 30% requirment

        ems-diver   31.6%

        nokia-vnfmdriver  31%
    c.Jenkins job  

        At lease three jenkins job faied for seven days.
    d. API link to reathedocs   ----------Already added 

        We have add the API to readthedocs 
    e.Doc Requirement          ---------- Finished two API documents  translation



Second topic

  1. Team looked through the RC0 checklist
    Team should pay attention to three items:
    a. Doc requirement, installation part 
    b. Release artifacts in nexus Release repo 



Action:

  1. Workflow docker image should be added into heat vfc_vm_init,sh

  2. Luxin will check all the failed jenkins job and fix them today.
  3. All component should add the related installation steps in readthedocs.(15 components )

  4. Jinhua will check vfc/ztesdncdriver docker crash issue in openlab and fix it today.

  5. Yan will look through the Independent Versioning and Release Process and contact Gary wu to know more details about the process.
  6. Yan will contact Helen to know about the Volte End to End integration test plan.
  • No labels