Attendees:
Ritusood,maopeng,jinhua,Yan Yang,Lu xin,Shashank, yufei
Agenda:
- summarize the M4 status and remaining issues
- look through RC0 checklist
Minutes:
First topic
- Yan summarized the VF-C M4 status and related issues.
VF-C M4 is still in progress,because the following issues.a. Code coverage --------- Already reach 30% requirment
ems-diver 31.6%
nokia-vnfmdriver 31%
c.Jenkins jobAt lease three jenkins job faied for seven days.
d. API link to reathedocs ----------Already addedWe have add the API to readthedocs
e.Doc Requirement ---------- Finished two API documents translation
Second topic
- Team looked through the RC0 checklist
Team should pay attention to three items:
a. Doc requirement, installation part
b. Release artifacts in nexus Release repo
Action:
Workflow docker image should be added into heat vfc_vm_init,sh
- Luxin will check all the failed jenkins job and fix them today.
All component should add the related installation steps in readthedocs.(15 components )
Jinhua will check vfc/ztesdncdriver docker crash issue in openlab and fix it today.
- Yan will look through the Independent Versioning and Release Process and contact Gary wu to know more details about the process.
- Yan will contact Helen to know about the Volte End to End integration test plan.