You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Next »

In progress

We will use vFW use case as the baseline to test this:

Pre-requirement: Instantiate a vFW with closed loop running.

Time (EDT)Categories

Sub-Categories

(In Error Mode Component)

Time to Detect Failure and RepairPass?Notes

VNF Onboarding and DistributionSDC



SO



A&AI



SDNC






VNF InstantiationSDC



VID



SO



A&AI



SDNC



MultiVIM



Closed Loop

DCAE





DMaaP



Policy





A&AI



APPC (3-node cluster)


Requirement

Area

Priority

Min. Level

Stretch Goal

Level Descriptions (Abbreviated)

Resiliency

High

Level 2 – run-time projects
Level 1 – remaining projects

Level 3 – run-time projects
Level 2 – remaining projects

•1 – manual failure and recovery (< 30 minutes)
•2 – automated detection and recovery (single site) (<30 minutes)
•3 – automated detection and recovery (geo redundancy)

  • No labels