You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 14 Next »

Jira reference:  REQ-633 - Getting issue details... STATUS

Test lab: CMCC lab

Legend:

NOT STARTED IN PROGRESS DEFERRED COMPLETED

Italics - Regression test cases

S. No.TopicTest Case DescriptionPriorityDependency/IssueTesterStatusRemarks
TN_01Service/template designSuccessful design of TN NSST and Slice Profile Templates1

COMPLETED

Need to confirm with Chuyi Guo

TN_02modify max-bandwidth of existing TN NSSIModify the maximum bandwidth of an existing TN NSSI1
Henry Yu

IN PROGRESS

90% complete

SDNC testing is done

SO testing is in progress

TN_03modify connection links existing TN NSSIAdd new connection links to existing TN NSSI1

IN PROGRESS

90% complete


TN_04modify both max-bandwidth and connection links of TN NSSIModify both the maximum bandwidth and add new connection links to an existing TN NSSI1

COMPLETED

SO blocking issue has been resolved.

TN_05three-domain networkTest create TN NSSI (or other NSI life cycle operations) on a three-domain network (i.e., need 3 ACTN PNC simulators)1

COMPLETED


  • No labels