      1. What your team has achieved
      2. Block issues / help needed


  • Reference VNFs (vFW/vLB)
    • vLB/vDNS demo with patched VPP 1707 working in local OpenStack
    • Next steps:
      • Clean up and stabilize vLB/vDNS installation process
      • Test the VNF in local environment, WindRiver lab, and Rackspace
  • Test
    • Provided assistance on CSIT questions and implementation
  • vCPE use case
    • Working on the Heat template that spin up the use case networks and VMs
    • Reviewed detailed network design/configuration, need to clarify the network configuration between vGMUX-vGs
    • Revised service model to mimic real life scenario better
    • Discussed service model with SDC, no main issues identified
    • Discussed service model and work flows with SO. Will continue the discussion with the goal of creating sample designs.
    • Had a preliminary discussion with SDNC team to review features required. Will continue the discussion this week.
  • VoLTE use case
    • SDC/SO/Modeling teams have agreed upon the approach to support TOSCA template as input for VoLTE use case
    • Reviewed an example of VoLTE TOSCA template from Open-O
    • Discussed two blocking issues reported from DCAE team (how to do service registration/discovery in both VM and container environment)
    • Finished the draft of VoLTE integration test cases
    • SDC TOSCA template details have not been finalized, teams will have two more meetings to discuss this week 
  • Release / O-Parent
    • Artifact versioning:
      • ONAP will support individual artifacts having their own versions and release schedules
      • Implementation details ongoing; should be finalized shortly
    • Helped prepare custom Jenkins slave VM images via packer for team requiring custom build environment
    • Code reviews and assistance on ci-management JJB submissions made by the community
  • Intel Developer Labs:
    • The Intel Hudson cloud (currently in use) has ~6TB storage, it is close to capacity.
    • The Intel Pharos ONAP cloud (POD-25) is installed as of last week - this cloud includes 74TB of combined local and shared storage.
    • POD-25 is awaiting IT approval for the external connections.  The external connection is expected to be approved this week.
    • Once the external connection is approved we will begin to move the development to Pharos POD-25
    • The goal is to complete the move (move all ONAP developers from Hudson to Pharos) by the end of Aug.
    • A request has been submitted to IT to connect POD-25 to POD-14 via a tunnel to allow a VXLAN connection, for deployment testing.
  • Bootstrap
    • Created Unit Tests that covers lib/aai script
    • Refactor the current Unit Tests.
  • E2E Integration Lab
    • For VoLTE case, CMCC lab is redesigning and reconstructing network topology, will conclude before next week ideally.
    • There are some discussion on how to integrate with each other between VoLTE case sponsors. They need reach some consensus before actions.
    • For vCPE case, WindRiver and Intel Multi-geo lab will be the chosen to do the E2E test.  Since there is no special requirements for hardware, it will be ready after intel team delivering relevant VPPs. 