Attendees:

 Ritusood,han yanan,maopeng,jinhua,Yan Yang,Victor Gao,Lingli,Lu xin,Shashank,xiaodong ning, xinhui li,yunlong, yufei

Agenda:

  1. summarize the recent work and give some feedback to the team
  2. look through M4 Code Freeze checklist

Minutes:

First topic

  1. Yan summarized the team work progress.

    a. M2 and M3 Status      --------- Already passed

        Should continue to increase the Unit test code coverage
    b.Docker images

        Finished most of components docker images except workflow component
    c.Integration with OOM

        VF-C scripts haven’t been merged into OOM repo
    d. CSIT Test         --------- Need add more CSIT Test

        https://wiki.onap.org/display/DW/VF-C+CSIT+Test+Cases+guide
    e.Doc Requirement          ---------- Finished two API documents  translation

    Guide : http://onap.readthedocs.io/en/latest/guides/onap-developer/how-to-use-docs/include-documentation.html
    f. Module view Requirement(video/webina)       -------- Only finished one draft PPT

    Needs 5 to 10 minutes video/webinar and provides overview of the functional module and how it fits into the overall architecture and how it relates to other ONAP components.

    g. SDC and A&AI Work progress.
    VF-C team is collecting the VNF CSAR package examples from VoLTE VNF vendor and will be reviewed by SDC team in SDC weekly meeting.
    A&AI schema changes haven't  merged into A&AI repo.


Second topic

  1. Team looked through the M4 checklist
    Team should pay attention to three items:
    a. Doc requirement
    b. Independent versioning and release plan
    d. CSIT test reach 100% 


Action:

  1. Each components should follow the csit guide to finish the csit test cases before M4

  2. Workflow should finish the docker image build early this week.
  3. Lcm should follow the doc guide to add one document to doc repo.

  4. Weitao should feedback the A&AI schema changes today.

  5. Maopeng and Mandeep should cooperate to merge the VFC scripts to OOM repo.
  6. Yan will send the VF-C view draft to the team to review.
  7. Yan will schedule a meeting to discuss the VF-C version and release plan

  • No labels