Attendees:

Yan, maopeng, jinhua , Fei Zhang, Guole, jinhua, mingzhang li, Shobana, Sirisha, Tianxin Liu

Agenda:

  1. Integration testing summary 
  2. VF-C requirements collection for Dublin release 

  3. SOL005 alignment in  NSLCM  (Verizon, Zte) 

Meeting Slides:

ONAP-VF-C weekly meeting_20181203.pptx


Minutes:


  1.  Yan summarized the Integration testing status and thanks the outstanding contribution of the team member

     For VFC,mainly participated in vCPE with Tosca VNF use case which tested in CMCC lab. In this use case, All VNFs are deployed by GVNFM , not rely on third-party software and devices. 

     For design time, Because SDC doesn’t support distribute ETSI –Aligned VNF packages and NS packages, we use a workaroud way during testing:  the ETSI-aligned VNF/NS packages are uploaded as VNF/NS artifacts.
     For runtime, we found that due to SO containerization architecture adjustment, all tosca path coudn't work perperly , in order to avoid so block our testing and considering UUI have supports VF-C interfaces in this release,         we just bypass so, using UUI to trigger the NS LCM operation

     All test related link can be found in the meeting slides

  2. VF-C requirements collection for Dublin release 
    VF-C requirements collection for Dublin release
    look through the current requirements.
    Need to consider the operators' requirements and use case as the Dublin release input 
  3.  SOL005 alignment 
     Maopeng present the work that need to be done  to align SOL005 
     will continue to discuss with Version  offline to see the task assignment 

Action:

 1.  Yan check the operators' requirements and use case requirements for VF-C Dublin input

 2.  Committer follow up the coming email about "Confirming your committer role for VF-C"

 3. Yan,  Maopeng and shobana discuss the SOL005 alignment work in Dublin release offline

 4. Yan ,Maopeng and Bharath discuss the SOL003 alignment work in Dublin release

 5. Yan collect the contribution from contributor in Casablanca release and  prepare to nominate new committer

 6. Contributors and committers feel free to fill the Resource commitment column in VF-C requirements collection for Dublin release