This table summarizes each project's plan in regard to support of "Platform Maturity" in Honolulu Release. The data below are extracted from each project plan.

The Platform Maturity recommendations are documented in Platform Maturity Requirements (and sub-pages) from Jason Hunt

Legend

Color code:

  • Red: below maturity level from previous release
  • Yellow: same maturity level than previous release.
  • Green: improved maturity level from previous release

M2 Actual represents the assessment before M2 (from previous release or the starting point for a new project).

M2 Target represents, at M2 date (spec freeze) what the team plans to implement.

M3 result (code freeze) represents what has been really implemented at M4 date . All these fields are self-assessed by the team.

CII Badging Tracking: http://tlhansen.us/onap/cii.html


AREA

Design / Run-Time

Performance

(min: Level 2 for closed-loop project; 0 for others)

Stability

(min: level 2 all projects)

Resiliency

(min: level 2 for runtime, level 1 others)

Security

(min: Project Level 2, 70% at silver)

Scalability

(min: level 1 for runtime projects)

Manageability

(min: level 2 all projects)

Usability

(min: level 2 all projects)

Min TSC Recommendations
M2 Actual

M2 Target

M3 result

(code freeze)

M2 ActualM2 TargetM3 resultM2 ActualM2 TargetM3 resultM2 ActualM2 TargetM3 resultM2 ActualM2 TargetM3 resultM2 ActualM2 TargetM3 resultM2 ActualM2 TargetM3 result
Project Name





















A&AIR1111112221+ (75% toward silver)1+ (75% toward silver)1+ (75% toward silver)111

1


11111
Common Controller SDKR000NANA12221+ (75% towards silver)1+ (75% towards silver)1+ (75% towards silver)NANANA222221
CPSR00

0


1

(Note #4)

cannot update until after RC0 because CPS is New0

1

(Stretch 2)

cannot update until after RC0 because CPS is New1+ (90% towards silver)220002220

1

(Stretch 2)

1
DCAED & R1112222221+ (84% Silver)1+ (84% Silver)1+ (95% Silver)1111+1+1+ 

1+

(Note#1)

1+1+
DMaaPR111222222

1+

1+1+1111+1+1+111
External API FrameworkR2222222221+1+1+111111222
HolmesR2221111+1+1+1+1+1+1111111+1+1+
Microservices BusR222222222111222222222
ModelingD/R111222222111+111222222
Multi VIM/CloudR111222222222111111222
ONAP CLID & R1111112221.5 Note #21.5 Note #21.5 Note #21111112 (Note #2)2 (Note #2)2
ONAP Optimization FrameworkR111111222

1+

(84% towards silver)

1+

(84% towards silver)

1+

(85% towards silver)

111111111
ONAP Usecase UI ProjectR111222222

1+

(89%  silver)

1+

(89%  silver)

1+

(89%  silver)

111222222
Policy Framework Project ProposalD & R

D: 1

R: 2

D: 1

R: 2

D: 1

R: 2

2

22

D: 2

R: 2

D: 2

R: 2

D: 2

R: 2

2 (silver)2

2

(57% towards gold)

1

11

2

21222
SDN-CR0001112221+ (75% towards silver)1+ (75% towards silver)1+ (75% towards silver)111222222
Service Design & CreationD000

2


2

(Note #4)

2

(Note #4)

1

11

1

(Note #5)

1

1

(Note #5)

111

1

(Note #6)

1

1

(Note #6)

111
Service OrchestratorR111111222

1+

(89% towards Silver)

1+1111111111
VFCR111222222111+111222222
VIDR000

2

22222222111

2

22222
VNF SDKD0001111111.5


1.51.5111111

2

(Note #7)

22


Note 1: Level2 - Swagger definition completed; new component API's standardized with ONAP API Common Versioning Strategy and some existing component (VESCollector) updated

Note 2: CLI https enabled, direct vaulnerability cleared with avaiable new 3rd party versions, but silver badge is not applied yet. so given with 1.5. increased manageability by providing additional commands already. usability increased with provided web console, linux console and direct mode

Note 3: Angular upgrade Completed, Security updates planned in Guilin release for Portal.

Note 4: Assumption is that platform 72 hour test is run by Integration team

Note 5: plus AAF-generated certificate and HTTPS mode by default.

Note 6: logging spec very close to 1.2;

Note 7: VNFSDK integrate OPNFV Dovetail and ONAP CLI to run the xNF Test cases and VNFSDK also have a portal to trigger the tests.