Test Lab: Win Lab, Rutgers University

Legend:

NOT STARTED IN PROGRESS DEFERRED COMPLETED

JIRA: https://jira.onap.org/browse/REQ-1151

RAN NSSMF integration test

S. NoTest CaseDescriptionPriorityDependency/IssueTesterStatusRemarksTest Details
1Service/template designSuccessful design of RAN NSST, RAN NF NSST, TN MH NSST, TN FH NSST, RAN Slice Profile, RAN NF Slice Profile, TN MH Slice Profile, TN FH Slice Profile Templates1

COMPLETED




2Service instantiation (Option 1) - New NSI,  new TN FH NSSI When triggered by RAN NSSMF with allocateNSSI for allocating a TN FH NSSI, SO (TN NSSMF) triggers OOF for TN NSSI selection, OOF provides null solutions(i.e., suitable and shareable TN FH NSSI not available) and the allocate WF should process with creation of new TN FH NSSI.1

COMPLETED




3Service instantiation (Option 1) - New NSI,  new TN MH NSSI When triggered by RAN NSSMF with allocateNSSI for allocating a TN MH NSSI, SO (TN NSSMF) triggers OOF for TN NSSI selection, OOF provides null solutions(i.e., suitable and shareable TN MH NSSI not available) and the allocate WF should process with creation of new TN MH NSSI.1
Deepika S 

COMPLETED




4Service instantiation (Option 1) - New NSI, reuse TN MH NSSIReuse existing TN MH NSSI1

COMPLETED

 Pre-requisite: There is an existing TN MH NSSI that is suitable and can be reused. This requires either providing the service parameters in such a way TN MH NSSI is reused, or creating a suitable and shareable TN MH NSSI upfront.

5Service instantiation (Option 1) - New NSI, reuse TN FH NSSIReuse existing TN FH NSSI1

COMPLETED

Pre-requisite: There is an existing TN FH NSSI that is suitable and can be reused. This requires either providing the service parameters in such a way TN FH NSSI is reused, or creating a suitable and shareable TN FH NSSI upfront.

6Service Termination (Option1)When triggered by RAN NSSMF with DeallocateNSSI for deallocating existing TN FH NSSI, SO (TN NSSMF) triggers OOF for terminate call, OOF returns whether the NSSI should be terminated or not. If it returns TN FH NSSI can be terminated and the WF should process with deallocation of existing TN FH NSSI.1
Deepika S 

COMPLETED




7Service Termination (Option1)When triggered by RAN NSSMF with DeallocateNSSI for deallocating existing TN MH NSSI, SO (TN NSSMF) triggers OOF for terminate call, OOF returns whether the NSSI should be terminated or not. If it returns TN MH NSSI can be terminated and the WF should process with deallocation of existing TN MH NSSI.1
Deepika S 

COMPLETED




8Service Termination (Option1)This should terminate TOP RAN NSSI but terminate only RAN NF NSSI and TN FH NSSI, and not TN MH NSSI1

COMPLETED

This can happen  when only 1 Service Profile is linked to NSI and 1 Slice Profile each is linked to RAN & CORE NSSIs, but > 1 Slice Profile is linked to TN MH NSSI.Modify deallocate operation is not supported yet, TN NSSMF will update the status as completed without modifying/deallocating the NSSI
9Service Termination (Option1)This should terminate TOP RAN NSSI but terminate only RAN NF NSSI and TN MH NSSI, and not TN FH NSSI1

COMPLETED

This can happen  when only 1 Service Profile is linked to NSI and 1 Slice Profile each is linked to RAN & CORE NSSIs, but > 1 Slice Profile is linked to TN FH NSSI.Modify deallocate operation is not supported yet, TN NSSMF will update the status as completed without modifying/deallocating the NSSI
10RAN Slice allocation with CPS (Option1)Request trigger from RAN NSSMF should create a RAN Slice in ran-network1SO (RAN NSSMF), SDNC, RAN Simulator, CPS

COMPLETED




11RAN Slice allocation with CPS (Option1)Verify the RAN Slice allocation in RAN Simulator1SO (RAN NSSMF), SDNC, RAN Simulator, CPS

COMPLETED




12RAN Slice allocation with CPS (Option1)Verify the RAN slice Configuration update in CPS1SO (RAN NSSMF), SDNC, RAN Simulator, CPSAhila P 

COMPLETED




13RAN slicing with CPSYang model upload to CPS using DML Plugin1SDNC, CPSNiranjana Y 

COMPLETED


This test case work with the CPS component installed in K8 cluster using helm chart.
14RAN Slice TerminationRRM Policy update & RRMPolicyMember Removal
SDNC, CPS

DEFERRED




  • No labels