- – is the last day for Service Providers to include their requirements into this page
- – is the last day for providing use case/functional requirements as a candidates for Dublin
- - is the last day for getting all of the requirements (architecture, security, projects, S3P etc.) and getting a single consolidated list so all of the projects have full picture of what is required from them. By this date, all use cases/functional requirements need to be discussed with a different projects, and demanded scope of development should be clear to the projects
- Vf2f in December – making a decision of what is indeed included in Dublin, based on Service providers priorities and projects’ commitments
REQ | Dublin Requirement, along with link for details or description | Service Provider Requesting (incl. SP name and requirement priority e.g. p1, p2, p3) | How to test (existing or new use case) | Owner (person) | Owner (project(s), S3P, functional requirement/use case) |
---|---|---|---|---|---|
1 | K8S based Cloud-region support
| Verizon: P1 Vodafone - P3 | vFW use case (existing but with Helm charts) EdgeXFoundry use case (new use case) | Victor Morales | Impacted projects: Multi-Cloud, SDC, SO, VNFSDK,VNFRQTS ( Containerized VNF Onboarding, Helm Charts)(?) functional requirement |
2 | Continue SOL 003 Alignment work in VF-C - Aligned with VF-C PTL. Content will be finalized as part of Dublin planning | Verizon Deutsche Telekom - P3 China Mobile - P2 Vodafone - P1 Telecom Italia - P2 | Project (VFC) development, VNFRQTS (VNF Life Cycle Operations?) | ||
3 | Start SOL 005 Alignment work ( with basic interfaces ) between SO & VF-C - Had handshake with SO and VF-C PTLs. Content will be finalized as part of Dublin planning | Verizon Deutsche Telekom - P3 China Mobile - P2 Vodafone - P2 Telecom Italia - P2 | Projects (VFC, SO) development | ||
4 | Implementation of “ONAP managing 5G as transport for CCVPN” usecase | Verizon Deutsche Telekom - P2 Vodafone - P1 | Use case (CCVPN) extension, no details available | ||
5 | Change Management extension including 5G requirements | Orange - P1 AT&T - P1 Vodafone - P2 | Lukasz Rajewski to be confirmed | Functional requirement (Change Management) extension | |
6 | True orchestration. We still need too many manual tasks to deploy a service (preload, various requests to deploy a service...) | Orange - P1 Verizon - P1 Deutsche Telekom - P1 Swisscom - P1 Bell Canada - P0 Vodafone - P1 Telecom Italia - P1 | Architecture enhancement (SO, SDNC, CDS) | ||
7 | Service modeling extension. Need to define service parameter and their link with VNF or network parameter. Need to define parameters that can be modified by end-user | Orange - P2 Vodafone - P2 | Eric Debeau | Modelling enhancement (SDC, SO, AAI) | |
8 | Tooling to operate ONAP: provide set of tools to configure ONAP via GUI (eg users, roles...), to restore the set of database... | Orange - P2 Verizon - P1 Deutsche Telekom - P3 Vodafone - P3 Telecom Italia - P3 | Project (OOM) development | ||
9 | Provide accurate documentation for operational teams, for newcomers | Orange - P0 Verizon - P0 Deutsche Telekom - P1 China Mobile - P1 Swisscom - P1 Vodafone - P0 Telecom Italia - P1 | Documentation, all projects | ||
10 | External API extension to include service modification | Orange - P2 Verizon - P3 Deutsche Telekom - P3 China Mobile - P3 Swisscom - P1 Vodafone - P2 Telecom Italia - P2 | BBS use case (proposal) | Project (External API) development | |
11 | No more hard coded components for the use-cases. ONAP is a platform to run various use-cases (similar to requirement #6 and #24) | Orange - P2 Verizon - P1 Deutsche Telekom - P1 Swisscom - P1 Vodafone - P1 Telecom italia | Architecture enhancement | ||
12 | Footprint optimization: reduce image size, avoid image duplications, reduce memory requirements. | Orange - P1 Verizon- P1 Deutsche Telekom - P2 Swisscom - P3 Vodafone - P3 | |||
13 | Stability first. Code must be more robust, more secure. Integration must focus on code stability and not on use-cases verification | Orange - P0 Verizon - P0 Deutsche Telekom - P0 Swisscom - P0 Vodafone - P0 Telecom Italia - P1 | S3P (Integration + All projects) | ||
14 | 5G requirements (cf ORAN) PNF discovery Support of parameters/algorithm/model configurations | Orange - P1 Deutsche Telekom - P2 AT&T - P2 Vodafone - P3 Telecom Italia - P1 | Use case 5G (SDC, AAI, APPC, etc.) VNFRQTS ( covering PNFs) | ||
15 | Core Service/VNF LCM state and transition model | Deutsche Telekom - P1 Vodafone - P1 | Michael O'Brien - for Logging | ||
16 | Focus on Platform Automation Usecases (e.g. Scale In-Out, Upgrade of VNFs) to show the E2E Management capabilities of ONAP (addition to lines 6, 11) (similar to requirement #6 , #24 , #11) | Deutsche Telekom - P1 AT&T - P1 (Assuming it overlaps with Req# 5 & 30) Vodafone - P1 Telecom Italia | Use cases (platform capabilities) VNFRQTS | ||
17 | Classification of core dependencies between e.g. Service/VNF components to support root cause analysis and alignment of change procedures (LCM) | Deutsche Telekom - P2 Vodafone - P2 | Modelling enhancement | ||
18 | PNF Modelling and Lifecycle Management to support the well defined exposure of the service endpoints (e.g. support for Edge/OSAM usecases) | Deutsche Telekom - P2 Swisscom - P1 AT&T - P1 Turk Telekom - P1 Vodafone - P3 Telecom Italia - P1 | Use case 5G (PNF support (Modelling, SDC) VNFRQTS | ||
19 | The logs of SO, SDC, SDNC, DCAE, and AAI need to be optimized. The log location of error is not particularly clear | China Telecom - P1 Deutsche Telekom - P3 Vodafone - P3 | Michael O'Brien | S3P and projects (SO, SDC, SDNC, DCAE, and AAI)
-
LOG-707Getting issue details...
STATUS
- LOG-877Getting issue details... STATUS - LOG-487Getting issue details... STATUS - SO-1110Getting issue details... STATUS - LOG-178Getting issue details... STATUS - LOG-376Getting issue details... STATUS See deployment diagram for streaming compliance plan | |
20 | Tomcat, mongodb, zookeeper, it is recommended that each docker use a unified version | China Telecom - P1 Deutsche Telekom - P2 China Mobile - P3 Vodafone - P3 | S3P and projects | ||
21 | Some dockers use mysql in onap, some use mariadb, different dockers use the same database version is also inconsistent, resulting in very confusing, it is recommended to have a unified version and software. | China Telecom - P1 Deutsche Telekom - P2 China Mobile - P3 Vodafone - P3 | S3P and projects (SDNC,APP-C,PORTAL,VID,NBI,CLAMP,Policy,SO OOM - - OOM-1175Getting issue details... STATUS , Mike Elliott) | ||
22 | Onap's heat and oom mode deployments require openstack support, so how onap handles and breaks some of the limitations of openstack, such as the limit of 100 stacks. | China Telecom - P1 Deutsche Telekom - P3 Vodafone - P3 | See Roger Maitland and Eric Debeau comments below OOM ?S3P | ||
23 | Ability to model running instance of VNF / NS and associate it as part of NS Design (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Verizon Deutsche Telekom - P3 China Mobile - P1 Vodafone - P1 Telecom Italia - P1 | Modelling enhancement | ||
24 | Enable Self-Service use of ONAP (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) (similar to requirement #6 and #11) | Bell Canada - P1 Deutsche Telekom - P2 Vodafone - P2 Telecom Italia - P2 | Architecture enhancement | ||
25 | Multi-site / Geo-redundancy (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Bell Canada - P1 Deutsche Telekom - P2 Vodafone - P2 | |||
26 | PNDA integration (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Bell Canada - P1 Deutsche Telekom - P1 China Mobile - P1 Vodafone - P2 | Project (DCAE, CLAMP) | ||
27 | ONAP Databases as a service (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Bell Canada - P1 Deutsche Telekom - P2 China Mobile - P3 Vodafone - P3 | |||
28 | Enhanced ONAP CI (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Bell Canada - P1 Deutsche Telekom - P1 Vodafone - P3 Telecom Italia | S3P | ||
29 | Use of secure credentials storage for native ONAP functionality (description is under Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals) | Bell Canada - P1 Deutsche Telekom - P2 Vodafone - P2 | Project (AAI) | ||
30 | VNF scaling enhancements: Manual and Automatic Scale In | AT&T - P1 Vodafone - P1 | Scott Blandford | Functional requirement Impact Details Here. APPC, SDC, SDNC, DCAE, OOF, Policy, SO, CLAMP, VID, VNFRQTS | |
31 | OSAM | AT&T - P1 Swisscom - P2 Turk Telekom - P1 Vodafone - P3 Telecom Italia | Use case | ||
32 | Edge Automation WG - "Analytics-as-a-service for Service Assurance" Fine Grain Placement Service (F-GPS) Edge Automation (Dublin) More information here: - ONAPARC-280Getting issue details... STATUS | China Mobile - P1 Vodafone - P3 Verizon AT&T | Fine Grain Placement Service (F-GPS) Edge Automation (Dublin) | Srinivasa Addepalli (Temporary) | Functional requirements: Edge Automation WG – ramki krishnan, Raghu Ranganathan Projects: DCAE, CLAMP, A&AI (TBD), Multi-VIM/Cloud (TBD) |
33 | BroadBand Service requirements: BBS Broadband Service Use Case (Dublin) | Swisscom - P1 Vodafone - P3 Telecom Italia | Use case | ||
34 | 5G requirement: 5G middle/backhaul modeling and orchestration | China Telecom - P1 China Mobile - P2 Vodafone - P2 Telecom Italia | Use case - details are needed | ||
35 | AT&T - P1 | Functional requirement SO,VID,SDNC,OOF, UUI,VFC | |||
36 | Evolve OOM to support Multi-site deployments of ONAP and meet Operator requirements (Likely aligns/overlaps with requirement #25 above) | AT&T - P2 Vodafone - P2 | Project (OOM and (likely) all components it deploys) Please see OOM comments added to #25 | ||
37 | Continue progress on S3P levels across components
| AT&T - P2 China Mobile - P3 Vodafone - P3 | Michael O'Brien (Logging) | S3P Most (all?) components depending on current S3P levels achieved - LOG-380Getting issue details... STATUS - LOG-877Getting issue details... STATUS - LOG-876Getting issue details... STATUS - LOG-376Getting issue details... STATUS - LOG-494Getting issue details... STATUS - LOG-707Getting issue details... STATUS - LOG-178Getting issue details... STATUS - LOG-487Getting issue details... STATUS | |
38 | The End-End use cases that define the functionality of ONAP releases, and are tested by Integration test should include validation of the example VNFs used by ONAP (e.g. vFW) using the test scripts for HEAT templates (from VVP project) or TOSCA ( from VNFSDK project) | AT&T - P3 Vodafone - P3 | run validation tests on the VNFs used by ONAP during integration test - TOSCA packaged VNFS using VNFSDK validation scripts and HEAT VNFS using VVP | Integration project VNFSDK @ Weitao Gao VVP @ Steven Wright @ Trevor Lovett INT @ Helen Chen applies to ALL uses cases tested by ONAP ALL ONAP VNFS should have their conformance to VNFRQTS documented in ReadTheDocs for the Release. This should include links to the VNF Packages used for onboarding. | |
39 | Using "Cloud Services Architecture" constructs in building service level APIs | Verizon | |||
40 | Continuation of HPA (Mostly Hardening - Add new e2e test cases, automate the integration steps for continuous testing). Automation for various use cases (vFW, vDNS with different HEAT templates, vCPE with different TOSCA templates) Exceptions:
Automation scripts to do following:
Even though this work is as part of HPA, we hope that this work helps in stabilization of code, checking for any regression on continuous basis. | Alexander Vul | |||
41 | VSP Compliance Check within SDC | Vodafone | Rabi Abdel | VSP Compliance Check within SDC (Dublin) - Phase 1 |
Analysis of Requirements
Kevin McDonnell The following are some aids to help understand the table above. The official roadmap and priorities are maintained elsewhere (Jira) so the data below will grow stale immediately!
- Dublin SP Priorities -latest.pdf (Mindmap of Requirements, PDF)
- Dublin SP Requirements-Latest.xmind (Mindmap of Requirements, using XMind)
- Dublin SP Requirements-Ranked.xlsx (Ranking of Priorities, XLS)
The highest priority SP requirements are PNF support, scaling and change management.
10 Comments
Srinivasa Addepalli
I feel that we should put the functional requirements/use cases in this page that have owners.
For others, I think this page should be used: Release 4 (Dublin) Service Providers (EUAG) Requirements / Proposals
Alla Goldner
Srinivasa Addepalli: I am merging the contents into this single page
Srinivasa Addepalli
Thanks Alla Goldner
I think it is good to identify owners for each of the functions being requested by SPs.
Srini
Roger Maitland
With respect to #22, deployment of ONAP with OOM doesn't require OpenStack for the ONAP components themselves just the Network Functions deployed by ONAP (the new PNDA components of DCAE complicate this a small bit currently but I expect that all components will be containerized in Dublin). I don't believe the Integration team is fully testing OpenStack/Heat based deployments of ONAP anymore (used in pair wise testing only?) and many ONAP S3P features are not supported by Heat so use of OOM is strongly recommended. If you believe requirement #22 still to be valid, please elaborate.
Thanks, Roger
Eric Debeau
I agree with Roger.
In addition, I do not understand the limit of 100 stacks for OpenStack..It is 100 stacks by tenant (default configuration) not by VIM:
https://docs.openstack.org/heat/latest/configuration/config-options.html
cf max_stacks_per_tenant parameter
Eric Debeau
I believe that Req #14 and #18 are similar
Alla Goldner
They both include a different extensions of PNF support
ramki krishnan
I believe Req #18 and #32 are closely related. It may be worthwhile having a separate column to indicate the requirement commonalities.
Kevin McDonnell
Based on a weighted ranking of the operator priorities (Number of Operators who voted * Relative Priority (P0-P4)), the priority is as follows:
ravi rao
I see this Usecase that is being proposed for Dublin. At Fujitsu Network communications we are interested in providing an Orchestration for Fronthaul and Backhaul Optical network. Can any one please let us know what would be best way to get this included
Regards,
Ravi